User's Manual
Table Of Contents
- ===============================
- MAIN MENU
- MASTER INDEX
- GLOSSARY
- ===============================
- DEFINITY® ECS Release 8.2 Administration for Network Connectivity
- Contents
- Preface
- 1 Networking Overview
- 2 H.323 Trunks
- Overview
- H.323 Trunk Administration
- Enabling Administration
- H.323 Trunk Administration — Task Summary
- H.323 Trunk Administration — Task Detail
- Task 1 — Assign Node Names
- Task 2 — Define IP Interfaces
- Task 3 — Assign Link via ethernet Data Module to the LAN
- Task 4 — Create a signaling group
- Task 5 — Create a trunk group
- Task 6 — Modify signaling group
- Task 7 — Specify codecs
- Troubleshooting IP Solutions
- 3 C-LAN Administration
- Overview
- Configuration 1: R8r <—ppp—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 2: R7r (+CMS) <—ethernet—> R7csi
- Task Summary
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Define IP Interfaces
- Switch 2 Task— Assign Link via ethernet Data Module to the LAN
- Switch 2 Task — Assign IP Route (to Switch 1)
- Switch 2 Task— Assign Processor Channels
- Intuity System Administration
- Administer Subscribers
- Worksheet A: Names and IP Addresses for Lucent Intuity System
- Worksheet B: LAN Data for the Lucent Intuity System
- Enable links and processor channels
- Configuration 3:R8si<—x.25 —> R8r Gateway <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign pdm Data Module
- Switch 1 Task — Assign Link via x.25 Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Link via procr-intf Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 3 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 3
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign Signaling Group and administered NCA TSC
- Switch 1 Task — Assign ISDN-TSC Gateway
- Switch 2 Task — Assign Signaling Group and administered NCA TSC
- Switch 3 Task — Enable Bus Bridge Connectivity
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign Link via ppp Data Module to Switch 1
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to Ethernet
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5B:R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a)
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign IP Route: C-LAN(a) to node-3
- Switch 1 Task — Assign IP Route: C-LAN(b) to node-2
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- 4 Networking Example
- A Screens Reference
- Networking Screens
- Other Network-Related DEFINITY Screens
- Networking Screens
- Node Names
- page 1
- Pages 2 – 6
- IP Interfaces
- IP Routing
- IP Media Parameters
- Data Module Screens
- Common Data Module Fields
- Data Module — Type ethernet
- Data Module — Type ppp
- Data Module — Type procr-intf (used for BX.25 connections with the si model)
- Data Module - type X.25 (used for BX.25 connections with the r model)
- Data Module - type pdm (used for BX.25 connections with the r model)
- Communication-Interface Processor Channel
- Circuit Packs
- Signaling Group
- ISDN TSC Gateway Channel Assignments
- Other Networking-Related DEFINITY Screens
- Communication Interface Links
- Data Module - type netcon
- Data Module - type analog-dm
- Extended Trunk Access Call Screening
- Extension Number Portability Numbering Plan
- Hop Channel Assignments Screen
- Implementation notes
- Node Number Routing
- Message Waiting Indication Subscriber Number Prefixes
- Synchronization Plan
- Pages 1–X of the screen
- Uniform Dial Plan
- B Private Networking
- Contents of this Appendix
- Distributed Communications System
- Description of DCS
- DCS Features
- Italian DCS Protocol
- ISDN/X.25 gateway
- DCS Over ISDN-PRI D-channel
- DCS feature considerations
- DCS Interactions
- Example DCS configurations
- Centralized Attendant Service
- Extended Trunk Access
- Extension Number Portability
- Inter-PBX Attendant Service
- Private Network Access
- Uniform Dial Plan
- ISDN Feature Plus
- QSIG
- Centralized Voice Mail Via Mode Code
- Japan TTC Q931-a Private Networking Protocols
- C Security Issues
- D Capacities and Performance
- E C-LAN Installation
- F IP Trunk Installation and Administration
- IP Trunk Installation
- IP Trunk Administration
- Procedures for Extension Dialing Between Sites
- DCS over IP Trunk
- DCS or Dedicated Trunks to Specific Locations Configurations
- Rerouting calls when IP transmission quality is poor
- Placing a test telephone call
- Setting up alerts on IP trunks
- Alert types
- Viewing error messages
- Troubleshooting IP trunk
- Maintaining the performance of the IP trunk server
- Configuring Microsoft NetMeeting™ on a PC
- IP Trunk Worksheets
- G References
- Glossary
- Index

G References
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
462
DEFINITY ECS Release 8.2 — Maintenance for R8.2r, 555-233-117, Issue 1
Provides detailed descriptions of the procedures for monitoring, testing,
troubleshooting, and maintaining the R8.2r ECS. Included are maintenance
architecture, craft commands, step-by-step trouble-clearing procedures, the
procedures for using all tests, and explanations of the system’s error codes.
DEFINITY ECS Release 8.2 — Maintenance for R8.2si, 555-233-123, Issue 1
Provides detailed descriptions of the procedures for monitoring, testing,
troubleshooting, and maintaining the R8.2si ECS. Included are maintenance
architecture, craft commands, step-by-step trouble-clearing procedures, the
procedures for using all tests, and explanations of the system’s error codes.
DEFINITY ECS Release 8.2 — Maintenance for R8.2csi, 555-233-119, Issue 1
Provides detailed descriptions of the procedures for monitoring, testing,
troubleshooting, and maintaining the R8.2csi (Compact Modular Cabinet) ECS.
Included are maintenance architecture, craft commands, step-by-step trouble-clearing
procedures, the procedures for using all tests, and explanations of the system’s error
codes.
Call center documents
These documents are issued for DEFINITY ECS Call Center applications. The
intended audience is DEFINITY ECS administrators.
DEFINITY DEFINITY ECS Release 8 — Guide to ACD Call Centers, 555-233-503, Issue 2
This module contains information about the call center-specific features of the
DEFINITY ECS.
DEFINITY ECS Release 8 — Call Vectoring/EAS Guide, 555-230-521, Issue 4
Provides information on how to write, use, and troubleshoot vectors, which are
command sequences that process telephone calls in an Automatic Call Distribution
(ACD) environment.
It is provided in two parts: tutorial and reference. The tutorial provides step-by-step
procedures for writing and implementing basic vectors. The reference includes
detailed descriptions of the call vectoring features, vector management, vector
administration, adjunct routing, troubleshooting, and interactions with management
information systems (including the Call Management System).
DEFINITY ECS Release 7— Basic Call Management System (BCMS) Operations,
555-230-706, Issue 2
Provides detailed instructions on how to generate reports and manage the system. It is
intended for telecommunications managers who wish to use Basic Call Management
System (BCMS) reports and for system managers responsible for maintaining the
system.