User's Manual
Table Of Contents
- ===============================
- MAIN MENU
- MASTER INDEX
- GLOSSARY
- ===============================
- DEFINITY® ECS Release 8.2 Administration for Network Connectivity
- Contents
- Preface
- 1 Networking Overview
- 2 H.323 Trunks
- Overview
- H.323 Trunk Administration
- Enabling Administration
- H.323 Trunk Administration — Task Summary
- H.323 Trunk Administration — Task Detail
- Task 1 — Assign Node Names
- Task 2 — Define IP Interfaces
- Task 3 — Assign Link via ethernet Data Module to the LAN
- Task 4 — Create a signaling group
- Task 5 — Create a trunk group
- Task 6 — Modify signaling group
- Task 7 — Specify codecs
- Troubleshooting IP Solutions
- 3 C-LAN Administration
- Overview
- Configuration 1: R8r <—ppp—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 2: R7r (+CMS) <—ethernet—> R7csi
- Task Summary
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Define IP Interfaces
- Switch 2 Task— Assign Link via ethernet Data Module to the LAN
- Switch 2 Task — Assign IP Route (to Switch 1)
- Switch 2 Task— Assign Processor Channels
- Intuity System Administration
- Administer Subscribers
- Worksheet A: Names and IP Addresses for Lucent Intuity System
- Worksheet B: LAN Data for the Lucent Intuity System
- Enable links and processor channels
- Configuration 3:R8si<—x.25 —> R8r Gateway <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign pdm Data Module
- Switch 1 Task — Assign Link via x.25 Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Link via procr-intf Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 3 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 3
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign Signaling Group and administered NCA TSC
- Switch 1 Task — Assign ISDN-TSC Gateway
- Switch 2 Task — Assign Signaling Group and administered NCA TSC
- Switch 3 Task — Enable Bus Bridge Connectivity
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign Link via ppp Data Module to Switch 1
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to Ethernet
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5B:R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a)
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign IP Route: C-LAN(a) to node-3
- Switch 1 Task — Assign IP Route: C-LAN(b) to node-2
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- 4 Networking Example
- A Screens Reference
- Networking Screens
- Other Network-Related DEFINITY Screens
- Networking Screens
- Node Names
- page 1
- Pages 2 – 6
- IP Interfaces
- IP Routing
- IP Media Parameters
- Data Module Screens
- Common Data Module Fields
- Data Module — Type ethernet
- Data Module — Type ppp
- Data Module — Type procr-intf (used for BX.25 connections with the si model)
- Data Module - type X.25 (used for BX.25 connections with the r model)
- Data Module - type pdm (used for BX.25 connections with the r model)
- Communication-Interface Processor Channel
- Circuit Packs
- Signaling Group
- ISDN TSC Gateway Channel Assignments
- Other Networking-Related DEFINITY Screens
- Communication Interface Links
- Data Module - type netcon
- Data Module - type analog-dm
- Extended Trunk Access Call Screening
- Extension Number Portability Numbering Plan
- Hop Channel Assignments Screen
- Implementation notes
- Node Number Routing
- Message Waiting Indication Subscriber Number Prefixes
- Synchronization Plan
- Pages 1–X of the screen
- Uniform Dial Plan
- B Private Networking
- Contents of this Appendix
- Distributed Communications System
- Description of DCS
- DCS Features
- Italian DCS Protocol
- ISDN/X.25 gateway
- DCS Over ISDN-PRI D-channel
- DCS feature considerations
- DCS Interactions
- Example DCS configurations
- Centralized Attendant Service
- Extended Trunk Access
- Extension Number Portability
- Inter-PBX Attendant Service
- Private Network Access
- Uniform Dial Plan
- ISDN Feature Plus
- QSIG
- Centralized Voice Mail Via Mode Code
- Japan TTC Q931-a Private Networking Protocols
- C Security Issues
- D Capacities and Performance
- E C-LAN Installation
- F IP Trunk Installation and Administration
- IP Trunk Installation
- IP Trunk Administration
- Procedures for Extension Dialing Between Sites
- DCS over IP Trunk
- DCS or Dedicated Trunks to Specific Locations Configurations
- Rerouting calls when IP transmission quality is poor
- Placing a test telephone call
- Setting up alerts on IP trunks
- Alert types
- Viewing error messages
- Troubleshooting IP trunk
- Maintaining the performance of the IP trunk server
- Configuring Microsoft NetMeeting™ on a PC
- IP Trunk Worksheets
- G References
- Glossary
- Index

459
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
G References
This Appendix lists the complete set of current DEFINITY ECS user documentation and selected
related documents.
This appendix contains a list of user documents for the DEFINITY Enterprise Communications Server (ECS)
Release 8.2. Most of these documents are backward compatible with DEFINITY ECS Release 7 systems.
To order these or other DEFINITY documents, contact the Lucent Technologies Publications Center at the
address and phone number on the back of the title page of this document. A complete catalog of Business
Communications Systems (BCS) documents is available on the World Wide Web:
http://www.lucent.com/enterprise/documentation
Basic DEFINITY ECS documents
These documents are issued for all new and upgrade DEFINITY ECS Release 8.2
systems.
Administration The primary audience for these documents consists of customer administrators.
DEFINITY ECS Release 8.2 — Administrator’s Guide, 555-233-506, Issue 1
A task-based document that provides step-by-step procedures for administering the
switch. This book contains information previously found in DEFINITY ECS
Administration and Feature Description, 555-230-522, and DEFINITY ECS Release
8 — Administrator’s Guide, 555-233-502, as well as new information for this release.
DEFINITY ECS Release 8.2 — Administration for Network Connectivity,
555-233-504, Issue 1
Describes how to administer connections between DEFINITY ECS switches (csi, si,
and r models) for DCS messaging. The main focus is on TCP/IP connectivity
introduced with DEFINITY Releases 7 and 8, including voice over IP (VOIP).
DEFINITY ECS Release 8.2 — Change Description, 555-233-411, Issue 1
Provides a high-level overview of what is new in DEFINITY ECS R8.2. Describes
the hardware and software enhancements and lists the problem corrections for this
release. It also includes any last-minute changes that come in after the remaining
books have gone to production.
DEFINITY ECS Release 8.2 — System Description, 555-233-200, Issue 1
Provides hardware descriptions, system parameters, listing of hardware required to
use features, system configurations, and environmental requirements.