User's Manual
Table Of Contents
- ===============================
- MAIN MENU
- MASTER INDEX
- GLOSSARY
- ===============================
- DEFINITY® ECS Release 8.2 Administration for Network Connectivity
- Contents
- Preface
- 1 Networking Overview
- 2 H.323 Trunks
- Overview
- H.323 Trunk Administration
- Enabling Administration
- H.323 Trunk Administration — Task Summary
- H.323 Trunk Administration — Task Detail
- Task 1 — Assign Node Names
- Task 2 — Define IP Interfaces
- Task 3 — Assign Link via ethernet Data Module to the LAN
- Task 4 — Create a signaling group
- Task 5 — Create a trunk group
- Task 6 — Modify signaling group
- Task 7 — Specify codecs
- Troubleshooting IP Solutions
- 3 C-LAN Administration
- Overview
- Configuration 1: R8r <—ppp—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 2: R7r (+CMS) <—ethernet—> R7csi
- Task Summary
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Define IP Interfaces
- Switch 2 Task— Assign Link via ethernet Data Module to the LAN
- Switch 2 Task — Assign IP Route (to Switch 1)
- Switch 2 Task— Assign Processor Channels
- Intuity System Administration
- Administer Subscribers
- Worksheet A: Names and IP Addresses for Lucent Intuity System
- Worksheet B: LAN Data for the Lucent Intuity System
- Enable links and processor channels
- Configuration 3:R8si<—x.25 —> R8r Gateway <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign pdm Data Module
- Switch 1 Task — Assign Link via x.25 Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Link via procr-intf Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 3 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 3
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign Signaling Group and administered NCA TSC
- Switch 1 Task — Assign ISDN-TSC Gateway
- Switch 2 Task — Assign Signaling Group and administered NCA TSC
- Switch 3 Task — Enable Bus Bridge Connectivity
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign Link via ppp Data Module to Switch 1
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to Ethernet
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5B:R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a)
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign IP Route: C-LAN(a) to node-3
- Switch 1 Task — Assign IP Route: C-LAN(b) to node-2
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- 4 Networking Example
- A Screens Reference
- Networking Screens
- Other Network-Related DEFINITY Screens
- Networking Screens
- Node Names
- page 1
- Pages 2 – 6
- IP Interfaces
- IP Routing
- IP Media Parameters
- Data Module Screens
- Common Data Module Fields
- Data Module — Type ethernet
- Data Module — Type ppp
- Data Module — Type procr-intf (used for BX.25 connections with the si model)
- Data Module - type X.25 (used for BX.25 connections with the r model)
- Data Module - type pdm (used for BX.25 connections with the r model)
- Communication-Interface Processor Channel
- Circuit Packs
- Signaling Group
- ISDN TSC Gateway Channel Assignments
- Other Networking-Related DEFINITY Screens
- Communication Interface Links
- Data Module - type netcon
- Data Module - type analog-dm
- Extended Trunk Access Call Screening
- Extension Number Portability Numbering Plan
- Hop Channel Assignments Screen
- Implementation notes
- Node Number Routing
- Message Waiting Indication Subscriber Number Prefixes
- Synchronization Plan
- Pages 1–X of the screen
- Uniform Dial Plan
- B Private Networking
- Contents of this Appendix
- Distributed Communications System
- Description of DCS
- DCS Features
- Italian DCS Protocol
- ISDN/X.25 gateway
- DCS Over ISDN-PRI D-channel
- DCS feature considerations
- DCS Interactions
- Example DCS configurations
- Centralized Attendant Service
- Extended Trunk Access
- Extension Number Portability
- Inter-PBX Attendant Service
- Private Network Access
- Uniform Dial Plan
- ISDN Feature Plus
- QSIG
- Centralized Voice Mail Via Mode Code
- Japan TTC Q931-a Private Networking Protocols
- C Security Issues
- D Capacities and Performance
- E C-LAN Installation
- F IP Trunk Installation and Administration
- IP Trunk Installation
- IP Trunk Administration
- Procedures for Extension Dialing Between Sites
- DCS over IP Trunk
- DCS or Dedicated Trunks to Specific Locations Configurations
- Rerouting calls when IP transmission quality is poor
- Placing a test telephone call
- Setting up alerts on IP trunks
- Alert types
- Viewing error messages
- Troubleshooting IP trunk
- Maintaining the performance of the IP trunk server
- Configuring Microsoft NetMeeting™ on a PC
- IP Trunk Worksheets
- G References
- Glossary
- Index

IP Trunk Administration
419
Administration for Network Connectivity
555-233-504 — Issue 1 — April 2000 CID: 77730
F IP Trunk Installation and
Administration
NT Tasks
• Log on to Windows NT and start the IP Trunk service
• Use the Configuration Manager to administer the routes and dialing permissions
you defined on the Dial/Routing Plan worksheets or the procedures for extension
dialing between sites.
• Use the Configuration Manager to set the IP Trunk service parameters
Plan call routing
Use the IP Trunk worksheets (shown at the end of this appendix) and/or the
Procedures for Extension Dialing Between Sites to plan and coordinate your IP Trunk
administration in Configuration Manager and DEFINITY ECS switch administration
software.
You will create a dialing and routing plan, then use the information to administer
DEFINITY ECS and the IP Trunk application. Read and follow these instructions
carefully.
Using the Procedures
for Extension Dialing
Between Sites
Follow these procedures for administering extension dialing between several sites.
This section includes the steps for administration as well as examples using three sites
that show DCS and non-DCS scenarios.
Using the Dial/Routing
Plan Worksheets
The worksheets are used for any two-site configuration allowing off-premise dialing.
Worksheet 1 is used to capture general information about your site.
Worksheets 2–8 are used for different levels of off-premise dialing restrictions at the
remote site, as listed in the following table.
Off-Premise Dialing at Remote Site:
Worksheet 2: No off-premise dialing at remote site.
Same Area Code
Worksheet 3: any exchange
Worksheet 4: only exchange X
Same Country
Worksheet 5: any area code
Worksheet 6: only area code X
Worksheet 7: any different country
Worksheet 8: only different country X