User's Manual
Table Of Contents
- ===============================
- MAIN MENU
- MASTER INDEX
- GLOSSARY
- ===============================
- DEFINITY® ECS Release 8.2 Administration for Network Connectivity
- Contents
- Preface
- 1 Networking Overview
- 2 H.323 Trunks
- Overview
- H.323 Trunk Administration
- Enabling Administration
- H.323 Trunk Administration — Task Summary
- H.323 Trunk Administration — Task Detail
- Task 1 — Assign Node Names
- Task 2 — Define IP Interfaces
- Task 3 — Assign Link via ethernet Data Module to the LAN
- Task 4 — Create a signaling group
- Task 5 — Create a trunk group
- Task 6 — Modify signaling group
- Task 7 — Specify codecs
- Troubleshooting IP Solutions
- 3 C-LAN Administration
- Overview
- Configuration 1: R8r <—ppp—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 2: R7r (+CMS) <—ethernet—> R7csi
- Task Summary
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Define IP Interfaces
- Switch 2 Task— Assign Link via ethernet Data Module to the LAN
- Switch 2 Task — Assign IP Route (to Switch 1)
- Switch 2 Task— Assign Processor Channels
- Intuity System Administration
- Administer Subscribers
- Worksheet A: Names and IP Addresses for Lucent Intuity System
- Worksheet B: LAN Data for the Lucent Intuity System
- Enable links and processor channels
- Configuration 3:R8si<—x.25 —> R8r Gateway <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign pdm Data Module
- Switch 1 Task — Assign Link via x.25 Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Assign Link via procr-intf Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 3 Task — Assign Node Names
- Switch 1 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 4: R8csi <—ISDN—> R8si Gateway <—ppp—> R8csi
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 3
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign Signaling Group and administered NCA TSC
- Switch 1 Task — Assign ISDN-TSC Gateway
- Switch 2 Task — Assign Signaling Group and administered NCA TSC
- Switch 3 Task — Enable Bus Bridge Connectivity
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign Link via ppp Data Module to Switch 1
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5A: R8csi <—ppp—> R8r (one C-LAN) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to Ethernet
- Switch 1 Task — Assign Processor Channels
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- Configuration 5B:R8csi <—ppp—> R8r (2 C-LANs) <—ethernet—> R8si
- Task Summary
- Prerequisite Administration
- Switch 1 Task — Assign Node Names
- Switch 1 Task — Assign Link via ppp Data Module to Switch 2
- Switch 1 Task — Assign IP Interfaces
- Switch 1 Task — Assign Link via ethernet Data Module to the LAN
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(a)
- Switch 1 Task — Assign Link via ppp Data Module to C-LAN(b)
- Switch 1 Task — Assign Processor Channels
- Switch 1 Task — Assign IP Route: C-LAN(a) to node-3
- Switch 1 Task — Assign IP Route: C-LAN(b) to node-2
- Switch 2 Task — Enable Bus Bridge Connectivity
- Switch 2 Task — Assign Node Names
- Switch 2 Task — Assign Link via ppp Data Module to Switch 1
- Switch 2 Task — Assign Processor Channels
- Switch 2 Task — Assign IP Route to node-3
- Switch 3 Task — Assign Node Names
- Switch 3 Task — Assign IP Interfaces
- Switch 3 Task — Assign Link via ethernet Data Module to the LAN
- Switch 3 Task — Assign Processor Channels
- Enable links and processor channels
- 4 Networking Example
- A Screens Reference
- Networking Screens
- Other Network-Related DEFINITY Screens
- Networking Screens
- Node Names
- page 1
- Pages 2 – 6
- IP Interfaces
- IP Routing
- IP Media Parameters
- Data Module Screens
- Common Data Module Fields
- Data Module — Type ethernet
- Data Module — Type ppp
- Data Module — Type procr-intf (used for BX.25 connections with the si model)
- Data Module - type X.25 (used for BX.25 connections with the r model)
- Data Module - type pdm (used for BX.25 connections with the r model)
- Communication-Interface Processor Channel
- Circuit Packs
- Signaling Group
- ISDN TSC Gateway Channel Assignments
- Other Networking-Related DEFINITY Screens
- Communication Interface Links
- Data Module - type netcon
- Data Module - type analog-dm
- Extended Trunk Access Call Screening
- Extension Number Portability Numbering Plan
- Hop Channel Assignments Screen
- Implementation notes
- Node Number Routing
- Message Waiting Indication Subscriber Number Prefixes
- Synchronization Plan
- Pages 1–X of the screen
- Uniform Dial Plan
- B Private Networking
- Contents of this Appendix
- Distributed Communications System
- Description of DCS
- DCS Features
- Italian DCS Protocol
- ISDN/X.25 gateway
- DCS Over ISDN-PRI D-channel
- DCS feature considerations
- DCS Interactions
- Example DCS configurations
- Centralized Attendant Service
- Extended Trunk Access
- Extension Number Portability
- Inter-PBX Attendant Service
- Private Network Access
- Uniform Dial Plan
- ISDN Feature Plus
- QSIG
- Centralized Voice Mail Via Mode Code
- Japan TTC Q931-a Private Networking Protocols
- C Security Issues
- D Capacities and Performance
- E C-LAN Installation
- F IP Trunk Installation and Administration
- IP Trunk Installation
- IP Trunk Administration
- Procedures for Extension Dialing Between Sites
- DCS over IP Trunk
- DCS or Dedicated Trunks to Specific Locations Configurations
- Rerouting calls when IP transmission quality is poor
- Placing a test telephone call
- Setting up alerts on IP trunks
- Alert types
- Viewing error messages
- Troubleshooting IP trunk
- Maintaining the performance of the IP trunk server
- Configuring Microsoft NetMeeting™ on a PC
- IP Trunk Worksheets
- G References
- Glossary
- Index

QSIG B Private Networking
Administration for Network Connectivity
CID: 77730 555-233-504 — Issue 1 — April 2000
364
An analog voice terminal user activates SS-CCBS or SS-CCNR by pressing the Recall
button or flashing the switchhook and then dialing the Automatic Callback (ACB)
Activation feature access code. An analog user can activate only one ACB call at any
given time.
A multiappearance voice terminal user can activate SS-CCBS or SS-CCNR for the
number of ACB buttons assigned to the terminal.
SS-CC Options
QSIG SS-CC has the following major options that are negotiated between the
Originating and the Terminating PBX:
1 Path reservation — there are two methods of establishing the CC call:
a path reservation method
b non-reservation method
2 Retention of signaling connection — there are two ways in which SS-CC uses
call independent signaling connections:
a connection retention method
b connection release method
3 Service retention — there are two possible behaviors when User B is found to be
busy again after User A responds to SS-CC Recall:
a service retention method
b service cancellation method
As an originating PBX for QSIG SS-CC, DEFINITY ECS will select the following
major options:
• non-reservation method for the Path Retention option
• connection release method for the Retention of Signaling connection option
• service cancellation method for the Service Retention option
As a Terminating PBX for QSIG SS-CC, DEFINITY ECS will select the following
major options:
• non-reservation method for the Path Retention option
• either the connection release method or the connection retention method for the
Retention of Signaling connection option depending on which the originating
PBX requests.
• service cancellation method for the Service Retention option
QSIG Centralized
AUDIX
QSIG allows users on a remote node to “cover” to an AUDIX on another node. The
original calling and called party information is provided to AUDIX so that each is
identified properly during message recording/retrieval.
To use centralized AUDIX, you must use QSIG Diversion. On a remote switch, the
call covers using Diversion to the hunt group assigned to AUDIX on the host switch.
Then the host switch sends all the appropriate information to AUDIX so that AUDIX
correctly answers the call.