Installation guide
Chapter 2. CLI Syntax Reference
108 3ware SATA+SAS RAID Controller Card CLI Guide, Version 10.2
/c1/bbu Battery Temperature Status = OK
/c1/bbu Battery Temperature Value = 25 deg C
/c1/bbu Estimated Backup Capacity = 241 Hours
/c1/bbu Last Capacity Test = 22-Jun-2008
/c1/bbu Battery Installation Date = 20-Jun-2008
/c1/bbu Bootloader Version = BBU 0.02.00.002
/c1/bbu PCB Revision = 65
/cx/bbu test [quiet]
The /cx/bbu test command starts the battery capacity test. The test can take 
up to 24 hours to complete. During the test, the BBU is not capable of backup 
operation and the write cache of all units attached to that controller is 
disabled. After the test is completed successfully and the BBU status returns 
to OK, the write cache is re-enabled. 
Asynchronous Event Notification (AEN) messages are also generated by 
controllers to notify you of the command status. 
You can check for AENs with the controller alarms command 
/cx show alarms [reverse] or with the commands /cx show events [reverse] 
or /cx show AENs [reverse]. Using the reverse attribute lists the most recent 
AEN message at the top of the list. (For a list of all AENs, see the user guide 
that came with your 3ware RAID controller.)
/cx/bbu enable
The /cx/bbu enable command enables BBU detection on the controller. If the 
BBU is Ready, the controller utilizes BBU functionality in the event of a 
power failure. 
/cx/bbu disable [quiet]
The /cx/bbu disable command disables BBU detection on the controller. 
When disabled, the controller ignores the existence of the BBU and shows 
that no BBU is installed even if a BBU is physically attached.
Note: Once started, the test can not be terminated before it completes. Write 
cache cannot be enabled until the test completes.










