Installation Guide
TRIM & FASCIA           190, 440, 540 & 2000 SERIES
• All exposed wood substrate must be sealed in a manner that 
prevents moisture intrusion and water build up. To achieve 
this, use primer, paint, sealant and ashings as follows in these 
application instructions.
• Attach sot products only to framing members which have been 
kiln dried or air-seasoned to a moisture content of 19% or lower.
• Do not install sot over crooked framing materials.
• LP SmartSide Sot products are not designed for and are not 
suitable for use as siding or trim.
 Exception:  8 ft. long and 9 ft. long ber substrate sot panels. 
Reference the stamp rating on the back of the panel.
•  Sots must not be in direct contact with masonry, concrete, 
brick, stone, stucco or mortar. Backer rod is recommended to 
properly space materials at these location.
• Do not use staples
GENERAL REQUIREMENTS (CONTINUED)
• 76 and 190 Series 4 ft. wide strand sot carries a structural 
sheathing trademark in addition to its trademark for sot 
applications. Diagram 2a shows a structural decking application 
with a 76 or 190 series Sot/RSCD panel installed with the high 
appearance value, primed surface facing towards the open 
framing. Installation shall conform to roof sheathing installation 
requirements per the local code. This panel must bear a Rated 
Sheathing/Ceiling Deck trademark with span rating. Use within 
the limitations of the span rating.
• 38 Series strand and 76 Series ber sot panels do not bear 
Rated Sheathing/Ceiling Deck trademarks and are not acceptable 
for structural deck applications. They are designed for use in 
applications seen in diagrams 2b and 2c.
• Factory manufactured Cut-To-Width sot is approved for use in 
closed sot applications only. (See diagrams 2b and 2c)
• Field prepared Cut-To-Width sot should comply with local 
building codes.
• If sot panels need to be eld-cut to width, cut them 3/8 inch 
less than full width so you can leave a 3/16 inch space on each 
side.
• Space all end and edge joints 3/16 inch and apply sealant.
2a
CUTTING
2b
2c
Use LP SmartSide 
76 and 190 Series 
strand substrate 
sot panels 
bearing RS/CD.
Do not use ber 
substrate sot.
PREPARATION
Before You Begin
Limitations
Use LP SmartSide 
76 Series ber 
substrate or 38, 
76 or 190 Series 
strand substrate 
sot panels.
Open Sot
Closed Sot
Closed - Vented Sot
Use LP SmartSide 
Cut-to-Width 
vented sot 
panels. Position 
vents away from 
wall.
LP SmartSide Sot
2







