Installation Guide
6
STEP 2: PERMANENT INSTALLATION
1
A.
The ladder comes with pre–drilled holes for permanent installation at locations shown in
2
Figure 8. Shim, when necessary to fill
space between ladder
frame
and rough opening, at
3
pre–drilled locations.
Using
3/16
”
drill bit,
drill 3” deep pilot holes through shim and into
4
ceiling joists and header.
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
FIGURE 8: Aluminum and Wood series
23
24
B.
Install the ten 3
”
lag screws provided, at each location to permanently secure the ladder. Tighten
25
until head is snug against frame. Do not overtighten, or damage could occur.
26
27
C. WARNING: Never use deck or sheetrock screws in place of lag screws for
28
permanent installation.
29
30
D.
Remove temporary boards from ceiling installed in step 1.
31
32
STEP 3: ADJUST LADDER LENGTH
33
Remove plastic straps holding the sections together and carefully
34
unfold ladder to the ground rotating bottom section behind
35
middle section (Figure 9).
36
37
WOOD MODELS ONLY:
38
(Aluminum models: skip to next section on page 8)
39
40
A.
Press down on top and middle sections of the ladder to
41
ensure the power arms are fully extended before taking
42
measurements for trimming your ladder
43
FIGURE 9