Owner Manual
10
Step#2
Cut the provided rope in half so there are two equal length piece of rope. Before cutting the rope, make sure to
wrap the middle where you plan to cut with a small section of duct tape to prevent the rope from fraying.
Step # 3
Install the rope through the 4 lag eye bolts installed in the structural ceiling joists. The rope should be fed
through one lag eye, along the ceiling where the 4 foot distance between eyes is, through the second lag eye and
should have an equal amount of excess hanging from both ends. Repeat this same process on the other side.
Step # 4
Set assembled swing so that the bottom of the swing is approximately 20 inches off of the ground. This will
seem too high at first, but it will sink initially about 4 inches when the knots are tightened towards the end of
the installation process. Using a level, make sure swing is sitting level before tying the knots. We recommend,
using a 5 gallon bucket with blocks on top to achieve the 20 inch height for initial hanging. Over the course of
the first month depending on use, the swing will “settle” another inch or two. This settling is as a result of
the knot tightening and the rope slightly stretching.