Owner Manual

1
Instructions Table of Contents
Tools needed to complete an install- (Depends on which model)
-Electric Drill (for assembing the swing and for installing Lag Eye screws into ceiling)
-5/16” wood
bit (for installing Lag Eye screws into ceiling)
-Adjustable wrench or vise grips (for tightening eye bolts on Josh
ua)
-Rachet with
9/16” socket (Hayden model only-to install lag screws during assembly
)
-Level (for leveling the swing before t
ying figure 8 k
nots)
-Flat head scr
ewdriver (for assembling bed rail brackets and to torque lag ey
e bolts into ceiling joists)
-T25 star bit (
included in hardware pack
- used with provided screws to assemble swing- most models)
-Duct Tap (for cutting rope)
-Saw- preferabl
y
a hack saw (for cutting rope)
-5 gallon
bucket or stand to sit swing up off the ground during assemb
ly
Swing Asse
mbly Diagrams
Bed Rail bracket assembly diagram………………………………………………………Page 2
Joshua Model…………………………………………………………………………....Page 2-3
Avari Model……………………………………………………………………………..Page 2-3
Brynn Model- Use Joshua/Avari Assembly diagram…………………………………...Page 2-3
Hartwell Model- Use Joshua/Avari Assembly diagram………………………………...Page 2-3
How to attach lag eye bolts & eye bolts into side of Joshua, Avari, & Em
erson Models...Page 3
E
merson Model…………………………………………………………………………...Page 4
Noah Model……………………………………………………………………………….Page 4
Eliza Model………………………………………………………………………………..Page 4
Mercedus Model…………………………………………………………………………..Page 4
Hayden Model…………………………………………………………………………….Page 5
Aunt Janie Model…………………………………………………………………………Page 5
Swing Installion
***Note: This portion of the installation is very important! We recommend that this portion of the installation be
completed by a Licensed Contractor. The Lag Eye Bolts (provided in hardware pack) must be installed in
structural ceiling joists, as they will be what the ropes feed through to hold the swing to the ceiling. It is important
to properly complete this portion for swing to be installed safely!
Instructions on how to hang the swing (all models)……………………………….…Pages 6-10
Diagram and instruction on how to install Lag Eye Bolts into ceiling joist………….Pages 6-7
Diagram on how to tie a “Figure 8 knot” to support swing……………………………Page 8
Swing Care
How to adjust your swing……………………………………………………………….Page 10
How to care for your ropes………………………………………………………………Page 10

Summary of content (13 pages)