Installation Instructions
Safety Precautions:
Use in a well ventilated area. Wear gloves and wash hands after use.
Preparation:
Surfaces must be clean, dry and free from oil, wax and paint. Protect work area. Lightly roughen smooth surfaces for better
adhesion. Pre-fit parts to be joined.
Application:
In a clockwise direction, screw the cap and nozzle assembly down all the way to the tube shoulder, puncturing the tube. Remove the
cap counter clockwise from the nozzle. Apply the adhesive sparingly to one surface only using approximately one drop per square
inch of surface. Press surfaces together immediately. Hold in place for 15 to 30 seconds until bond sets. Do not reposition parts.
Clean tip of tube immediately after use with tissue and replace the cap. Leave parts undisturbed for at least 5 minutes. For full bond
strength, leave parts undisturbed overnight.
Clean-up:
After cleaning, wet any tissue used for wiping off glue with water and dispose of. When cleaning up larger quantities of uncured
adhesive, apply water and allow to cure and then scrape up. Note this may result in damage to the surfaces. Cured adhesive may
be cut away with caution using a sharp blade, removed with acetone or with boiling water. Note: Acetone is highly flammable and
may not be suitable for use on all materials, test surface first. Follow manufacturer’s instructions.

