Technical Specifications
Loctite® TITE FOAM
Insulating Foam Sealant
Page 2 of 4
Typical Uncured
Physical Properties:
Color: White
Appearance: Polymer foam
Base: Single component polyurethane
Odor: Slightly, of ether
Specific Gravity: 1.107
Flash Point: <20°C (<68°F)
VOC Content: 19.28% by weight CARB
208.6 g/l SCAQMD rule 1168
Shelf Life: 12 months from date of manufacture (unopened)
Lot Code Explanation: MM/DD/YYYY (bottom of canister)
MM/DD/YY (on box)
MM = Month of manufacture
DD = Day of manufacture
YYYY = Year of manufacture
Example: 10/31/2014 = October 31
st
, 2014
Typical Application
Properties:
Application Temperature: Ambient conditions should be between 23°F (-5°C) and 95°F (35°C). Can temperature must be
between 41°F (5°C) and 86°F (30°C).
For use at colder conditions, product should be stored at room temperature for at least 12 hours.
Tack-Free Time: 6-8 minutes* At 73°F and 50% relative humidity
Cut Time: 50-70 minutes*
Cure Time: Approx. 24 hours*
*Time is dependent on temperature, humidity and depth of sealant applied
Typical Cured
Performance Properties:
Color: White
Service Temperature: -40°F (-40°C) to 194°F (90°C)
-40°F (-40°C) to 248°F (120°C)
Long-term exposure
Short-term exposure
Paintable: Yes
Sandable: Yes
Dimensional Stability: < ±5% TM 1004-2012
Maximal Joint Width: 2 inches (5 cm) TM 1006-2011 (At 41°F)
Movement Capability: >25% TM 1013-2013
Shear Strength: 85 kPa TM 2012-2011
Directions:
Tools Typically Required:
Utility knife, painter’s tape or foil for protecting surfaces.
Safety Precautions:
Always wear eye protection, gloves and proper work clothes when using Loctite TITE FOAM. Wash hands after use. Cured
foam is difficult to remove from skin, clothing and other substrates. May discolor skin.
Surface Preparation:
Ensure all surfaces are clean and free from dirt, dust, oil and other contaminants likely to impair adhesion. Surfaces can be
moist but not frosted or iced. Cover surfaces not intended to be foamed. To ensure full and even curing of the foam on porous
substrates (ie. brickwork, concrete), moisturize surfaces with water spray before application.
General Preparation:
The temperature of the working area should be between 23°F (-5°C) and 95°F (35°C). The temperature of the product should
be between 41°F (5°C) and 86°F (30°C). When working in cold conditions, can should be stored at room temperature for at least
12 hours before use. Shake can vigorously before use for 30 seconds (15-20 times minimum). Screw the foaming straw to the
valve.




