Install Instructions

Installation & Operation Manual
12
2 Prepare water heater
Remove water heater from wood pallet
1. After removing the outer shipping carton from the water
heater, remove the parts box.
2. To remove the water heater from the pallet:
a. Remove the two (2) lag bolts securing the bottom
of the unit to the pallet.
b. Lift the water heater off the wall bracket mounted to
the pallet.
3. Remove the two (2) lag bolts securing the wall bracket to
the wood pallet. Be certain not to lose the wall bracket as
it will be needed for securing the water heater to the wall
(FIG. 2-1).
Do not drop the water heater or bump the
jacket on the floor or pallet. Damage to
the water heater can result.
The gas conversion procedure should be
accomplished BEFORE the water heater
is installed. For a water heater already
installed, you must turn off gas supply,
turn off power, and allow the water heater
to cool before proceeding. You must
also completely test the water heater
after conversion to verify performance as
described under Start-up, Section 10 of
this manual.
You must install the propane orifice to fire
the Armor wall mount water heater on
propane. Verify when installing that the
orifice size marking matches water heater
size (Table 2A). Failure to comply could
result in severe personal injury, death, or
substantial property damage.
1. Remove the front access cover from the unit (no tools
required for removal).
2. Disconnect the ribbon cable from the control board.
Remove the four (4) screws securing the bezel to the front
of the unit and remove the bezel.
3. Disconnect the Molex plug from the wiring connector
located on the gas valve.
4. Using a 5/16" nut driver, loosen the band clamp securing the
air intake coupler to the gas valve venturi. Remove the air
intake pipe and coupler from the gas valve venturi.
5. Using a 4mm Allen wrench, remove the two (2) screws
securing the gas valve venturi to the inlet of the combustion
blower (FIG. 2-2). Remove the gas valve venturi assembly
from the unit.
DO NOT DISCARD-
WILL BE NEEDED TO
SECURE THE WATER
HEATER TO THE WAL
L
REMOVE SHIPPING
[WALL] BRACKET
Figure 2-1 Water Heater Mounted on Shipping Pallet
Gas conversions
LP Conversion Table
Model LP Orifice Stamping
125 125
200 210 / W150
NOTICE
WARNING
Table 2A LP Conversion Table
Figure 2-2 Gas Valve Power Switch & Venturi Removal
DETAIL
POWER SWITCH
REMOVE THE TWO (2) SCREWS
SECURING THE GAS VALVE VENTURI
TO THE INLET OF THE COMBUSTION BLOWER
6. Using a 4mm Allen wrench, remove the four (4) screws
securing the gas valve to the venturi (FIG. 2-3).
7. Locate the propane orifice disk from the conversion kit bag.
Verify that the stamping on the orifice disk matches the
water heater size (125 - 200, see Table 2A).
8. Place the orifice into the black rubber grommet in the side of
the gas valve and secure inside the gas valve (see FIG. 2-3).
9. Reposition the gas valve against the venturi and replace the
four (4) screws removed in Step 6, securing the valve to the
venturi (FIG. 2-3).
10. Reposition the gas valve venturi assembly inside the unit.
Secure the gas valve venturi to the combustion blower by
replacing the two (2) screws removed in Step 5 (FIG. 2-2).
11. Reattach the air intake pipe and coupler to the gas valve
venturi. Tighten the band clamp to secure.