User Guide

1 Maintenance schedule
5
User’s Information Manual
Service technician
(Refer to the Copper-Fin Installation and
Service manual)
General:
Address reported problems
Inspect interior; clean and vacuum if
necessary;
Check for leaks (water, gas, flue)
• Examine venting system
Check system water pressure/
system piping/expansion tank
• Check fill water meter
Test boiler water. When test
indicates, clean system water with
approved system restorer following
manufacturer’s information.
Check control settings
Check wiring connections
Flame inspection (stable, uniform)
Check flue gas passageways
Inspect and clean the burner
Perform start-up check-out and
performance verification. Refer to
the Startup section in the Copper-
Fin Installation and Service manual
If combustion or performance
indicate need:
Clean heat exchanger
Remove and wash burner
Annual Startup
Owner maintenance
Daily
Check appliance area
• Check pressure/temperature
gauge
Monthly
Check vent piping
Check relief valve
Remove debris from Y-strainer
per manufacturer’s instructions
Check building recirculation
filter (if filter required)
Periodically
Test low water cutoff (if used)
Reset button (low water cutoff)
Every
6 months
Check appliance piping (gas and
water) for leaks
Operate relief valve
End
of season
months
Shut appliance down (unless
boiler used for domestic hot
water)