Manual

Loadstar Sensors, Inc. • www.loadstarsensors.com
2
C. If you have more than 12 load cells, then you need to daisy chain the SC-1200s. Connect
SC1200-Master’s Downlink-A to SC1200-Slave’s Uplink-Y (as shown below).
Each load cell/bin combination is uniquely identified with a 8 character identifier, for example,
M50.R00.C00.S01, M50.R00.C00.S02, ...S03, etc. This depends only on the port it is
connected to, not to the scale itself.
Attach the cable from the bin marked “…S01” to port number 1 of the SC-1200,
Attach the cable from the bin marked “…S02” to port number 2 of the SC-1200, and
so on.
The photo below shows 10 bins connected.