User's Manual
ISTALLATIO
ISTALLATIO
3
3
1. INTRODUCTION
1.1 OVERVIEW........................................5
1.2 START-UP..........................................5
1.3 PRODUCT DESCRIPTION................5
2. CONFIGURATION
2.1 WRCM PC USER INTERFACE AND
DRIVER INSTALLATION ..................6
2.2 APPLICATION OVERVIEW ..............6
2.2a Settings ......................................................6
2.2b Communication Port ..................................6
2.2c Configuration ..............................................6
2.2d Firmware Update ........................................6
2.2e Datalogger Mode ........................................7
2.2f Nodes; sensor type ....................................7
2.3 BASE STATION CONFIGURATION ..7
2.4 NODE CONFIGURATION..................7
2.5 FIRMWARE UPDATE (BASE
STATION ONLY) ................................7
2.5 CONFIGURATION OF A REMOTE RF
NODE ................................................7
3. INSTALLATION
3.1 GS22X INSTALLATION ....................8
3.1a Antenna Position ........................................8
3.1b Power Supply and Lockout Connection ......8
3.1c Wiring..........................................................8
3.2 LOAD CELL ......................................9
3.3 ANGLE SENSORS FOR THE BOOM
OR JIB ............................................10
3.3a Mounting Procedure..................................10
3.3b Angle Calibration Procedure № 1:
Mechanical Set-Up....................................10
3.3c Angle Calibration Procedure № 2: Correct
with the GS22X ........................................11
3.4 ANTI-TWO-BLOCK SWITCH ..........11
3.4a GS050 Installation ....................................11
3.4b GS075 Installation ....................................13
3.4c Chain length adjustment ..........................13
3.5 LENGTH SENSOR CABLE REEL ....14
3.5a Maximum Boom Extension ......................14
3.5b Mounting the Cable Reel ..........................14
3.5c Boom Length Calibration Procedure № 1:
Mechanical Set-Up....................................15
3.5d Boom Length Calibration Procedure № 2:
Correct with the GS22X ............................15
3.7 WIRELESS WIND SPEED SENSOR
GS020 ..............................................19
3.8 WIRELESS LOAD PINS..................20
3.8a LP011, LP015, and LP026 ........................20
3.8b Load Pin Transmitter GS001 ....................20
3.9 LINE RIDING TENSIOMETER ........21
3.9a Line Riding Tensiometer Installation ........21
3.9b Line riding tensiometer installation on a
swing arm..................................................22
3.12 LIST AND TRIM ANGLE SENSOR 26
3.12a Programming the GS22X for List and Trim
Indication26
3.12b Mounting Instructions................................26
3.12c List and Trim Angle Calibration Procedure ..26
3.13 ROPE PAYOUT................................27
3.13a Rope Payout Calibration Procedure № 1:
Mechanical Set-Up....................................27
3.13c Rope Payout Limits ..................................27
3.13d Electrical connections ..............................27
5. MAINTENANCE
5.1 GS22X BASE STATION ..................29
5.1 SENSORS........................................29
5.1a Replacing Sensor Battery ........................29
5.2 ANTI-TWO-BLOCK SWITCH ..........30
5.2a Replacing the GS050 Batteries ................30
5.2b Replacing the GS075 Battery ..................30
5.3 REPLACING A SENSOR ANTENNA ..31
5.4 LOAD CELLS ..................................32
5.4a Reading Accuracy ....................................32
5.4b Load Testing..............................................32
5.4c Care ..........................................................32
7. CERTIFICATION NOTES
TABLE OF CONTENTS
TABLE OF CONTENTS