User's Manual
ISTALLATIO
ISTALLATIO
27
27
3.13
3.13
Rope payout
Rope payout
Typically the rope payout sensor is factory installed
on the line riding tensiometer load sensor (figure
above). Alternatively the rope payout sensor may
be installed on an appropriate sheave (figure
below). Power supply must be provided to the rope
payout sensor. It indicates rope payout (length) and
rope speed.
Zero the rope payout using the Tare menu before
calibration.
3.13a Rope Payout Calibration
Procedure № 1: Mechanical
Set-Up
The GS22X must be connected to a computer to
proceed with the following.
1. Hoist up to reel in the wire rope fully.
2. Install the rope payout system.
3. Zero the rope payout length in the Tare menu
4. Hoist down to pay out a known length of wire
rope (for example: 20 feet).
5. Verify the rope payout indicated in the WRCM
matches the actual length of wire rope paid out.
If not then follow Rope Payout Calibration
Procedure № 2.
3.13b Electrical connections
Voltage: 9 to 30 Volts DC, about 0.3 Amp
Red wire: positive voltage
Blue wire: negative or ground
Two types of connections are recommended;
1) Always powered up
2) Powered-up at the same source as the
GS22X base station unit
Rope payout
sensor
Figure: Rope payout on a line riding tensiometer
Figure: Alternative installation of a rope payout