Product Manual
INSTALLATION
1.
2.
3.
4.
5.
6.
7.
8.
9.
3
With handle Drive Slot on left side (DS), lower Loadhandler® onto
upraised tailgate so that tailgate is between the rubber pads on
the brackets.
Slide the DS Bearing Bracket along Roller until near end of tailgate,
just clear of inside wall of truck bed. Slide the PS Bearing Bracket
along Roller until near end of PS tailgate (or near Red End Cap).
Position unit so dragsheet is approximately centered between
wheel wells. (On step-side pickups, it is best to have Dragsheet
closest to DS
of tailgate.)
Position Shaft Collars to 1/4" on either side of each Bearing
Bracket. Tighten Collar screws. Collars hold the Brackets in desired
position.
Choose best adjustment hole for each Rear Bracket. Slide each
Rear Bracket toward tailgate until Brackets make snug contact
inside and outside of tailgate. Tighten nuts & bolts.
Drop the tailgate and insert handle in DS slot. Turn handle thru full
circle to make sure it clears truck. If more clearance is needed,
loosen Collars and slide Roller further to DS, and then re-tighten
Collars. (In rare cases, when still more clearance is needed, the
Dragsheet itself may need to be moved closer to PS so more of
Roller Bar is available on DS. Unfurl Dragsheet to end, remove and
then re-tape an inch or two closer to PS.)
Spray-lubricate Roller where it passes thru each Bearing Bracket.
With tailgate down, feed long rear straps thru hinge gap between
tailgate and truck and attach to front strap buckle as shown.
Tighten straps by pulling thru buckle toward front of truck.
Close tailgate. Thread the Bumper Tie-Down strap upward thru DS
outside buckle and back down. Hook Bumper Tie-Down metal clip
to bottom of tailgate (to hold Tie-Down in place while driving). The
Bumper Tie-Down is utilized only when unloading. It holds
tailgate down while handle is cranked.
The Loadhandler® is now installed and you are ready to get load.