Installation Guide
+1 850 296 2377 Working hours : Mon - Fri 9:00 a.m. - 16:00 p.m. EST support@ihomeangel.com
www.ihomeangel.com Page: - 3 - / 4
Step A1: Slip stem (O) over the wires and then thread it into the top of fixture loop (S). Slip Fixture body (M) over
wires and then thread it onto the top of stem (O).
Step A2:Open the Wood bending (N) and arm (T) to equals, Fix the ring (P) on the Wood bending (N) with knob
nut (Q).
Step A3:Slip orderly the upper cover (K) and fixture loop assembly (L) along wires then thread onto the fixture
body (M) till tight. Fix the metal plate (V) and Bottom cover (W) on the Wood bending (N) with ball nut (U).
Step B1:
By measuring, determine the correct number of links needed for proper hanging height. Using the chain pliers,
disconnect and discard the remaining chain.
Step B2:Attach the quick link (H) to connect the chain (I) and the loop(J) on the the top of upper cover (K).
Step B3: Carefully lace the wires through the chain (I)(every other link)and stop just before you reach the top of chain (I).
Gently pull the wires till snug.
3 Turn off power
Before you start to make installation, NEVER attempt any work without shutting off the electricity until the work is
done. A). Go to the main fuse, or circuit breaker, box in your home. Place the main power switch in the “OFF” position.
B).Place the wall switch in the“OFF” position.
4 Make installation




