Instructions / Assembly
Wood Cottage Manual
Construction Manual © 2009 Little Cottage Co. Page 1
1
2
3 4
5
6
Once your site is ready you may begin construction of
your oor by laying out your 4x4 runners. You want to
place the runners evenly on 10’ and 12’ wide buildings,
8’ wide will only have 2 runners and they are 6’ apart.
Next install CDX ooring and make sure it is
ush on all sides. Secure in place by driving 1
1/4” screws through the sheeting into the 2x4’s
every 8”.
Now place 2x4’s, 16” on center, on top of the
4x4’s. Place 2 1/2” screws in each of the 4 cor-
ners. Measure from corner to corner to make
sure the oor is square. Now you can fasten
each 2x4 into the 4x4s with 2 1/2” screws.
Locate the rst wall panel, then set in place. Make
sure the wall is ush with the edge of the oor
structure, by using an angle. Apply pressure from
the outside and secure the wall panel to the oor
using 2 1/2” screws.
Next make sure you have 34” in between wall
for man door.
Fasten the wall with 2 1/2” screws as shown.
After you have your 34” opening for the man
door.