Instructions / Assembly

Wood Cottage Manual
Construction Manual © 2009 Little Cottage Co. Page 11
61
62
63 64
65
66
Continue with the last row as shown.
Next install OSB on dormer as shown. (you
may want to refer to the sheeting diagram that
has been provided)
Continue with the backside.
Make sure the trusses are spaced correctly,
secure with 1 1/4” screw every 8” O.C.
Roof Sheeting completed.
Next locate rakes. Make sure the peaks are
ush, secure with 2 1/2” screws.