Installation Guide

LED Lighting Surge Protection Modules
Design and Installation Guide
© 2016 Littelfuse • LED Lighting SPD Module Design and Installation Guide www.littelfuse.com
With IEC color wires (brown/blue) for Class II equipment
Neutral (Blue)
Line 120V, 240V, 277V, 347V, 480V
(Brown)
SPD
AC/DC
Power
Supply
LED
Module
+
Neutral (Blue)
Line 120V, 240V, 277V, 347V, 480V
(Brown)
SPD
AC/DC
Power
Supply
LED
Module
+
Brown
Blue
LSPxxyyyPX3316, for Class II equipment
xx = 05, 10; yyy = 120, 240, 277, 347, 480
LSP10yyySX3316, for Class II equipment
yyy = 120, 240, 277, 347, or 480
Ungrounded SPDs are suitable for Class II equipment.
Grounded SPDs are suitable for Class I equipment like:
1. Grounding wire comes with power wires from power distribution panel (TN network)
2. No grounding wire is provided; however, the pole has its own solid grounding to the soil.
(TT network)
Installation Guide
CautionRisk of electric shock
CautionInstallation and service must be performed by qualified personnel.
CautionRemove ALL electrical power before installation or service.
Keep wires as straight as possible.
Round wires rather than bending them at a hard 90 degree angle.
Connect wires as shown in diagrams.
Keep wires from the luminaire’s terminal block to the AC/DC power supply as short as possible
so that SPD is close to the AC/DC power supply.
Do not cross/overlap protected wires (after SPD, AC or DC) with unprotected wires
(before SPD, AC)
Ensure electrical connections and mountings are correct before energizing the circuit.
Installation Guide
22