Installation & Assembly

Table Of Contents
MAINTENANCE:
CAUTION:Always turn off AC power to the equipment before servicing. Servicing should be performed by a qualified
service technician. Use only MANUFACTURER supplied replacements parts.
BATTERY:The battery supplied with the EL model requires no maintenance. However, it should be tested periodically and
replaced when it no longer operates the connected sign for the duration of a 30-second or 90-minute test. The battery supplied
in this sign has a typical life of 5 years when used in a normal ambient temperature of 72° F.
INSTALLATION (relocation of lamp head to top of housing):
1.Remove the mounting hole plug located on the top of the housing.
2.Snap lamp head that was removed from the side of the housing into the mounting hole plug located on the top of the housing.
3.Route lamp head wires through housing channels and make connection on the lamp pc board.
3
3
INSTRUCTIONS for Lithonia Lighting ECRG SQ
Part No. 912-00196-001,
Rev A Prelim 10.19.2020
800-705-SERV (7378)
techsupport-emergency@acuitybrands.com
SAVE THESE INSTRUCTIONS
and deliver to owner after installation
LED COMBO EXIT & EMERGENCY LIGHT(cont.)
1.Apply AC power to the unit. Connect the battery to the PCBA, the LED indicator will be RED.
2.After the battery has been left to charge for 24 hours, test the unit by pushing the switch. The LED indicator turns OFF and the
LED board stays ON.
3.When the switch is released, the LED indicator turns back to RED and LED board stays ON.
OPERATION (battery backup):