Installation Sheet
Page 3 of 4
U991740 - Rev A
10/13/15
BLT LED IMPORTANT SAFETY INSTRUCTIONS
Figure 1: Built In T-Bar Clip
Figure 2: LATC Installation
(ORDERABLE OPTION)
1. Bend the built in T-Bar clips to secure the fixture to the T-Bar ceiling, or use hanger wire hole (see Figure 1)
If using LATC clips, attach the LATC clips using the provided screws after the fixture is placed in the grid (see Figure 2).
2. Place the fixture in the appropriate T-Bar ceiling structure.
3. Remove access plate and make electrical connections from supply and properly ground as local codes dictate.
4. Reinstall access plate.
THIS PRODUCT MUST BE INSTALLED BY A PERSON FAMILIAR WITH THE CONSTRUCTION AND
OPERATION OF THE PRODUCT AND THE HAZARDS INVOLVED, IN ACCORDANCE WITH THE
APPLICABLE INSTALLATION CODE
CE PRODUIT DOIT ÊTRE INSTALLÉ PAR UNE PERSONNE FAMILIÈRE AVEC LA CONSTRUCTION ET
L'EXPLOITATION DU PRODUIT ET LES RISQUES QU'IL ENTRAÎNE, CONFORMÉMENT AU CODE
D'INSTALLATION EN VIGUEUR
Installation Instructions
**Caution: MAKE SURE LUMINAIRE IS MOUNTED TO A SECURE STRUCTURE. USE APPROPRIATE MOUNTING
HARDWARE TO INSTALL FIXTURE RATED FOR YOUR APPLICATION. FAILURE TO MOUNT FIXTURE CORRECTLY
COULD RESULT IN SERIOUS INJURY.
ABOVE CEILING ACCESS REQUIRED
KEEP THESE INSTALLATION INSTRUCTIONS / CONSERVEZ CES INSTRUCTIONS D'INSTALLATION
HANGER WIRE ATTACH POINT
STANDARD 1 ½”
T-BAR
ONCE FIXTURE IS IN
GRID, ATTACH LATC
CLIPS (4) USING
PROVIDED SCREWS
(maximum 17 in-lbs)
BEND OUT HOOK 90 DEG. TO
ENGAGE T-BAR ALL (4) CORNERS
HANGER WIRE ATTACH POINT
STANDARD
1 ½” T-BAR
TO LED LIGHT ENGINE
WIRING DIAGRAM
EXISTING FIXTURE GROUND
INCOMING SUPPLY (Solid 18AWG)
WIRE COLOR
INDICATORS
SUPPLIED BDP




