Installation Guide

7
ASSEMBLY INSTRUCTIONS
9.
Feed chain (I) and wiring through threaded
ring (H) and then canopy (C), allowing
threaded ring (H) and canopy (C) to slide
down the chain (I) until they reach the top of
fixture (A).
Lift chain (I) toward screw collar loop (G) and
hang chain (I) on connecting chain link (J).
Re-close connecting chain link (J).
10.
Determine the hanging length for fixture (A). If you
will be using the chain (I) as is, please skip to the
following paragraph. If you wish to shorten the
chain (I), use pliers, a flathead screwdriver and a
soft cloth (none included) to open the link of chain
(I) at length chosen. Remove any extra chain (I) at
this time, including the link that was opened to
shorten the chain (I).
Feed wiring from fixture (A) up through chain (I) to
pre-determined length.
49
Soft Cloth
Pliers
Screwdriver
Wiring
I
I
(extra)
Feed wiring up through hole at bottom of threaded
rod (E). Gently push wiring until it comes through
top of threaded rod (E). Pull all wiring until there is
no extra slack left in the wires running through the
chain (I).
Prepare wires from outlet box by stripping 3/4 in. of
insulation from wire ends using wire strippers (not
included).
11.
Wiring
11
E
I
10
C
H
J
G
I