User's Manual
User Manual Rev 1.11
Basic/Smart/Smart Plus/Intelligent Charger-32A
68
Authorization (for SC3+/IC3 only)
Before the owner of an electric vehicle can start or stop charging, the Charge Point has to authorize the
operation.
4.2.1 Online Authorization
Description:
• Generally, before the owner of an electric vehicle can start or stop charging, the EVSE has to
authorize the operation. The EVSE SHALL only supply energy after authorization.
4.2.2 Local Authorization
Description:
• Synchronized with the Central System when EVSE is Online.
• To improve the experience for users, the EVSE MAY support local authorization when EVSE is
offline, and faster authorization response time when communication between Charge Point and
Central System is slow.










