Installation Guide
1. Slide brackets onto bottom rail and lift into
place between posts.
2. Offset bottom brackets 10" above nish
grade and center bottom rail on posts.
3. Mount brackets to posts using included
4 screws per bracket. Insert white screw
head caps to hide screws.
1. Insert vertical tongue and groove boards
into bottom rail from left to right.
2. Place U-Channel vertically on edge of
tongue and groove board #7 as shown.
1. Slide brackets onto top rail and place on top
of vertical tongue and groove boards.
2. Mount brackets to posts using included
4 screws per bracket. Insert white screw
head caps to hide screws.
Step-2 Vertical Tongue and Groove
Boards
Step-1 Bottom Rail
Step-3 Top Rail