Installation Guide
1. Dig a 3 foot deep by 10 inch diameter hole for each post footing. Use a post hole digger
or an auger.
2. Slide 4x4 vinyl posts over 4x4x96" lumber so that 2 feet of lumber is extended below
vinyl posts. Secure lumber to posts with included pan head screws below finish grade.
3. Insert posts and double-check measurements. Pour pre-mixed concrete into holes and
use a post level to make plumb.