Use and Care Manual
8
lci1.com 574-537-8900 CCD-0001583 Rev. 07.10.18
Manual information may be distributed as a complete
document only, unless Lippert Components provides explicit
consent to distribute individual parts.
All manual information is subject to change without notice.
Revised editions will be available for free download at
lippertcomponents.com. Manual information is considered
factual until made obsolete by a revised version.
Please recycle all obsolete materials and contact Lippert
Components with concerns or questions.
360 Siphon
®
Aftermarket Manual
Complete Installation
1� Remove old cap by gently removing the seal around the
base, making sure not to damage the roof top membrane.
2� Unscrew the base from the roof.
3� Clean off the roof, ll the screw holes and check the seal
around the stack.
4� Dry t the base, funnel and lid for proper t (Fig.17).
Note: Review Modied Installation section step 3 for any
concerns on the stack height and diameter.
5� Apply a small amount of adhesive/sealant around the
perimeter of the funnel that ts into the lid and insert
(Fig.18).
6� Locate the base over the stack pipe and screw to the roof.
7� Apply self leveling caulk around the base making sure to
cover the screws.
8� Apply sealant to the base and to the inside of the lid and
connect, making sure the funnel extends into the stack pipe.
Fig.17
Fig.18