Safety Information

Page 41 of 57 Report No.: LCS210301193AS
IEC 62368-1
Clause
Requirement + Test
Result - Remark
Verdict
TRF No. IEC62368_1D
Shenzhen LCS Compliance Testing Laboratory Ltd.
Add: Room 101, 201, Building A and Room 301, Building C, Juji Industrial Park, Yabianxueziwei, Shajing Street, Bao'an District, Shenzhen,
Guangdong, China
Tel: +(86) 0755-8259 1330 | Fax+(86) 0755-8259 1332 | E-mailwebmaster@lcs-cert.com | http:// www.lcs-cert.com
Clearance distanced between:
Required withstand
voltage
Required cl
(mm)
Measured cl (mm)
--
--
--
--
--
--
--
--
Supplementary information:
5.4.2.4
TABLE: Clearances based on electric strength test
N/A
Test voltage applied between:
Required cl
(mm)
Test voltage (kV)
peak/ r.m.s. / d.c.
Breakdown
Yes / No
--
--
--
--
--
--
--
--
Supplementary information:
5.4.4.2,
5.4.4.5 c)
5.4.4.9
TABLE: Distance through insulation measurements
N/A
Distance through
insulation di at/of:
Peak voltage
(V)
Frequency
(kHz)
Material
Required DTI
(mm)
DTI
(mm)
--
--
--
--
--
--
--
--
--
--
--
--
Supplementary information:
5.4.9
TABLE: Electric strength tests
N/A
Test voltage applied between:
Voltage shape
(AC, DC)
Test voltage (V)
Breakdown
Yes / No
Functional:
--
--
--
--
--
--
--
--
Basic/supplementary:
--
--
--
--
--
--
--
--
Reinforced:
--
--
--
--
--
--
--
--