1. Attach trays #1 to posts #2 using eight bolts-A. Tighten bolts-A firmly. Don't over-tighten bolts to avoid stripping.
2. Insert posts into base tubes. Secure with 2 bolts-A. Tighten firmly but do not over-tighten to avoid striping.