Manual
Page 3.
5. Route the hose from the bottom coolant
reservoir tting to the intercooler pump inlet and
secure to the bottom reservoir tting and the
pump using spring clamps or constant tension
clamps.
6. Fill the intercooler reservoir with green
ethylene glycol. Screw on the pressure cap
supplied in the LPE kit (PN: 703-1726). Refer
to gure 1 on page 4 for the boiling points of
different ethylene glycol aqueous solutions at
different pressure levels.
NOTE: LPE recommends using two (2) different
color coolants. One color for the intercooler
system, and the other color coolant for your
engine cooling. This is to differentiate between
the intercooler and the cooling system if a leak
occurs.
7. Screw the supplied pressure cap onto
the intercooler uid reservoir.
Installation of the LPE intercooler uid
reservoir kit is now complete.






