Owner's Manual
Pre-Installation Notes..................................................3
Operator Class Information ........................................3
Section A: Gate System Design/Installation......4& 5
Section B: Preparing the Site ....................................6
The Concrete Operator Pad......................................6
Electrical Power Requirements ...............................6
Placing Vehicle Detector Loops ..............................7
Section C: Installing the Operator ............................8
Attaching the Chain Bracket ....................................8
Placing the Tower Operator .....................................8
Electrical Hookup ......................................................9
Control Accessory Equipment Wiring ....................9
Wiring a 3 Button Station .......................................10
Bi-Parting (Master/Slave) Application ...................10
Optional Photoelectric Thru Beam Sensor...........11
Optional Photoelectric Retro-Reflective Sensor..12
Optional Electric Edge Sensor...............................13
Wiring Vehicle Detectors ........................................14
Wiring Radio Receivers ..........................................14
READ THESE STATEMENTS CAREFULLY AND FOLLOW THE
INSTRUCTIONS CLOSELY.
The Warning and Caution boxes throughout this manual are there to protect you and
your equipment. Pay close attention to these boxes as you follow the manual.
WARNING
Indicates a MECHANICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
CAUTION
Indicates a MECHANICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
Indicates an ELECTRICAL
hazard of INJURY OR
DEATH. Gives instructions
to avoid the hazard.
WARNING
Indicates an ELECTRICAL hazard
of DAMAGE to your gate, gate
operator, or equipment. Gives
instructions to avoid the hazard.
CAUTION
Figure 1
WARNING HIGH VOLTAGE
ONLY A QUALIFIED TECHNICIAN SHOULD SERVICE THIS GATE OPERATOR
PERIODICALLY TEST SENSITIVITY OF OVERLOAD
*** READ MANUAL ***
DATES OPERATOR
DATE TESTED DATE TESTED DATE TESTED DATE TESTED
SERVICED
LOG DATE OVERLOAD TEST
Wiring Keypad or Telephone Entry .......................15
Left/Right Hand Installations..................................15
Mounting the Limit Cams .......................................16
Presetting the Sensitivity Adjustment ..................17
Timer To Close Adjustment....................................17
Final Installation Checklist .....................................17
Pre-Power On Checklist..........................................17
Section D: Starting the Operator.............................17
Final Settings ...........................................................18
Maximum Run Timer ...............................................18
Notes.........................................................................18
Terminal Strip Reference Chart ....................19 & 20
Section E: End User Instructions............................20
Operational Guide for the End User ......................20
Manual Operation ....................................................20
Safety Guide for the End User ......................21 & 22
Wiring Diagram ........................................................23
Technical Specifications...........................................24
Warranty .....................................................................24
TABLE OF CONTENTS
2










