Installation Guide

2. Using a le
vel,
mark off a horizon
tal
line, and ensure
t
hat the ends of the brackets are spaced to the width
between the
inner edges of the
vertical aluminium
extrusions (see
illustration 1). Mark off the holes using a pencil.
3. Note: Screws supplied are only suitable for stud walls.
For drywall wall use special wall fasteners, available
from DIY or hardware stores. Seek advice from a
specialist about the suitability of screws to be used. Drill
the required holes and insert wall screws.
4. Screw the
bracket to
the wall using the
screws provided.
Please ensure the
screws are tight
but take care not to
overtighten.
5. Before making
any electrical con-
nections it is necessary to turn off the main electricity sup-
ply. This unit is provided with a supply cable already fit-
t
ed. This cable should be fitted to the household lighting
circuit or to a fused 3 AMP supply. Connections should
be made in accordance with the latest regulations. This
cabinet is manufactured to CLASS 1 and requires an
earth connection.
Illus
tration 1
Example 2
C
D
Release Leve
Magnet
Storage
Bar
Release Lever
OPER
ATING INSTRUCTIONS
125 Rt. 61 Schuylkill Haven, PA 17972
1-800-360-1585 • fax 570-385-5475 • info@ltlhomeproducts.com
www.ltlhomeproducts.com
1. Remove the packaging careully, do not lose the screws
LED ILLUMINATED MIRROR
Installation Instructions
Shadows
Press the touch sensor to control the LED light to controlthe on/off and
Keep pressing the touch sensor to control the brightness from bright to dark, or from dark to bright.
change the color temperature through the cycle of "on-4000K-6000K-3000K-off ".