Installation Guide
2. Using a le
vel,
mark off a horizon
tal
line, and ensure
t
hat the ends of the brackets are spaced to the width
between the
inner edges of the
vertical aluminium
extrusions (see
illustration 1). Mark off the holes using a pencil.
3.
N
ote: Screws supplied are only suitable for stud
w
alls. For drywall walls use special wall fasteners,
available from DIY or hardware stores. Seek advice fr
om
a specialis
t about the suitability of screws t
o be used.
Dr
ill the required holes and insert wall screws.
4.
Scr
ew t
he
bracket to
t
he wall using t
he
scr
ews pro
vided.
Please ensur
e t
he
scr
ews are full
y tight
but t
ake care not t
o
o
vertighten.
5. Befor
e mak
ing
an
y electrical con-
nections it is necessary to turn off the main electricity sup-
ply. This unit is provided with a supply cable already fit-
ted. This cable should be fitted to the household lighting
circuit or to a fused 3 AMP supply. Connections should
be made in accordance with the latest regulations. This
cabinet is manufactured to CLASS 1 and requires an
earth connection.
Example 2
Illustration 1
Example 2
C
D
E
Release Leve
Magnet
Storage
Bar
E
E
F
G
Release Lever
Magnet
Storage
Bar
C
Example
OPERATING INSTRUCTIONS
Lighting is turned on / o by touch sensor switch of mirror.
LED ILLUMINATED MIRROR
Installation Instructions
Saffron
125 Rt. 61 Schuylkill Haven, PA 17972
1-800-360-1585 • fax 570-385-5475 • info@ltlhomeproducts.com
www.ltlhomeproducts.com
1. Remove the packaging careully, do not lose the screws
C
Anti-fog
The defogger was controlled by touch sensor switch. The defogger will start to work when light turn on,
then the temperature will be raised to remove the fog after turn on for 5 minutes to 8 miniutes.



