X3 ESTATE SERIES INSTALLATION MANUAL MODEL SW 2000-X3 HEAVY DUTY, HIGH CYCLE SWING GATE OPERATOR MODEL SW 2000-X3 IS FOR VEHICULAR PASSAGE GATES ONLY, NOT INTENDED FOR PEDESTRIAN PASSAGE GATE USE 3 YEAR WARRANTY Serial # _____________________ (located on electrical box) Installation Date ______________
TABLE OF CONTENTS SAFETY SUMMARY ___________________________________________________________________1 BASIC INSTALLATION HINTS AND RULES ______________________________________________2 PART 1 SITE PREPARATION __________________________________________________________3 A. LOCATION AND LAYOUT ________________________________________________________________ 3 B. PAD AND MOUNT _______________________________________________________________________ 4 C.
TABLE OF FIGURES Figure 1. Gate Operator Layout Options____________________________________________________ 3 Figure 2. Pad and Mount. _______________________________________________________________ 4 Figure 3. Photo-Sensor Layout ___________________________________________________________ 6 Figure 4. AC Wiring____________________________________________________________________ 7 Figure 5. Gate Direction and UPS Low Battery Switch Locations. ________________________________ 8 Figure 6.
The LiftMaster Gate Operator Model SW 2000-X3 The LiftMaster Gate Operator model SW 2000-X3 is a full featured, commercial swing gate operator with a telephone interface. The gate operator contains the following features: • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • Rev Satisfies U.L. 325 requirements for primary (motor current) and secondary (photo) obstruction senses. Five different open inputs are available for a variety of devices. Dynamic motor braking limits gate overtravel.
SAFETY SUMMARY It is important for everyone involved in the installation and operation of the Gate Operator to read the following warnings. WARNING! 1. READ AND FOLLOW ALL INSTRUCTIONS. Improper installation of a gate operator can result in a dangerous system. SAVE THESE INSTRUCTIONS. 2. A vehicle gate is a large, heavy object that is moved by an electric motor. A moving gate can cause serious injury or death! The safety and well-being of others depends on the installation of a safe system. 3.
BASIC INSTALLATION HINTS AND RULES READ THIS SECTION CAREFULLY BEFORE BEGINNING YOUR INSTALLATION. 1. UNDERSTAND THE SYSTEM AND INSTALLATION SITE THOROUGHLY. The SW 2000 is a flexible and reliable gate operator system, but the quality of service depends directly on the quality of installation. Please read these instructions carefully and study the applicable diagrams before planning your installation. In particular, understand any site characteristics that may affect the system installation. WARNING 2.
PART 1 SITE PREPARATION A. LOCATION AND LAYOUT Figure 1.
• • NOTES Left Gate and Right Gate are determined by looking from inside the complex toward the street. Figure 1 shows a typical Bi-Parting gate in standard and compact installations. 1. Always install gate operators inside of the fence line, NEVER on the public side of the fence. 2. Mount all manual controls and activating devices at least 6 ft. away from the gate for safety. 3. Allow enough clearance around the gate and the gate operator for installation and service. B. PAD AND MOUNT Figure 2.
C. POWER WIRING 1. Provide a separate conduit stub for the AC power. 2. Each gate operator requires a 115 VAC 20 AMP single phase circuit NOTE: Master and Slave units each require separate circuits to prevent false overcurrent faults (see X3 Series Master/Slave Systems). 3. Wiring must comply with the local Electrical Code for operating a 1/2 HP motor. 12 AWG for up to 300' and 10 AWG for up to 500' long wire runs is suggested. 4.
PART 2 SYSTEM INSTALLATION A. GATE AND PHOTO-SENSOR LAYOUT Figure 3.
IMPORTANT NOTE The installation shown in Figure 3 is a suggested layout using emitters and receivers. Any UL-approved photo-sensors are acceptable, but they must cover the entire area of gate travel to be effective. 1. Install photo-sensors in three Coverage Areas as shown in Figure 3. Coverage Area A- Inside-Open Coverage: Inside the gate, from the gate post(s) to the gate fully open position(s).
D. RUNNING INPUT WIRING WARNING Route but do not connect input wires at this time. If inputs are connected now, the gate operator may activate at random during installation, potentially injuring installation personnel. 1. Remove the plastic control box cover. 2. Run wires from input components conduits and Master/Slave conduits into control box. 3. For Master/Slave wiring, refer to Master/Slave Systems for X3 Series Gate Operators, Part 2. E. SETTING GATE OPEN DIRECTION SWITCHES S2 AND S3 Figure 5.
F. POWER UP PROCEDURE CAUTION If gate is positioned at the 'open' limit, gate will automatically close if Relcose Timer is enabled and power is switched on. Position gate either at the closed limit or at no limit when preparing to switch power on. Always use extreme caution and follow all warning in the Safety Summary. 1. Turn on circuit breaker that provides power to gate operator. 2.
H. GATE ARM INSTALLATION NOTES: 1. All dimensions are measured from one pivot point to the next pivot point. 2. The dimensions shown above are only recommended settings. Your installation may require different dimensions. 3. The SW 2000-X3 can be installed without welding. The anchor, swing arm and drag link may be attached using the supplied hardware only, welded, or bolted and welded. 4.
I. SETTING LIMIT CAMS • Adjust the limit cams by loosening the clamp and rotating the cams. The cams rotate with the swing arm shaft, so small adjustments are magnified by the length of the gate. • Use manual controls to move the gate during limit cam adjustment. • To avoid damage to the gate and gate operator due to the gate overrunning its limits, perform the following steps carefully: 1.
2. SETTING LEFT GATE LIMIT CAMS Top Limit Cam Closed Gate Bottom Limit Cam Top Limit Switch Open Gate Bottom Limit Switch 01-20099F2 Figure 9. Setting Left Gate Limit Cam 1. Make sure that switch S2 is set to the "Left" position. 2. Turn on gate operator power switch. 3. Using manual OPEN and STOP, move the gate to its proper open limit position. 4. Loosen the clamp on the bottom limit cam and turn the cam clockwise until it just barely closes the limit switch. 5. Retighten the clamp.
J. GATE SENSITIVITY ADJUSTMENTS The gate operator monitors both average and peak motor current. When the gate encounters an obstruction, the gate operator senses the change in motor current and reverses the gate. Three sensitivity adjustments must be set for each installation: • Right gate motion (R69) • Left gate motion (R160) • Inrush current (R203) NOTE: For swing gate operation, controls are Left/Clockwise and Right/Counterclockwise.
Left Gate Motion Adjustment (R160) 1. Open the gate fully, then initiate closing the gate. 2. Wait 4 to 5 seconds, then lightly "bump" the leading edge of the gate to simulate an obstacle. 3. If the gate does not stop or back up, reopen the gate and adjust the pot slightly counterclockwise. 4. Repeat steps 1-3 until the gate stops or backs up when bumped and has the desired sensitivity. "OPEN TO LEFT" ADJUSTMENT PROCEDURES Left Gate Motion Adjustment (R160) 1. Initiate opening the gate. 2.
K. CONNECTING INPUT WIRING LOOP SENSOR LOOP SENSOR OUTSIDE INTERRUPT SENSE LOOP SENSOR INSIDE INTERRUPT SENSE O P T I O N SHADOW SENSE O P T I O N LOOP SENSOR EXIT SENSE O P T I O N O P T I O N GROUND LUG EXTERNAL GROUND (SEE SITE PREPERATION) 1390F6 Figure 11.
IMPORTANT: Before proceeding, see NOTES below. 1. Wire all external control devices to their connections on the control board as shown. See Appendix A for details on how each control input affects the gate operator. 2. Connect the Master/Slave interconnect cable (see Master/Slave Systems for X3 Series Gate Operators, Part 1). NOTES 1. Disconnecting the STOP terminal from the COMMON terminal stops the gate and prevents all commands from having any effect. Manual Open does not activate the Reclose Timer.
L. BASIC GATE OPERATOR PROGRAMMING Even if you plan to program the gate operator by telephone, you may want to enter some immediate instructions during installation. The following list of instructions will help you set basic controls so the gate will operate properly until you have time for full programming, either directly or by telephone. For complete programming instructions, refer to “SL 1000, SW 2000, and BG 3000-X3 Programming (-173 bd)”.
M. POST INSTALLATION PROCEDURES 1. Setup 1. Turn on the main power at the gate operator's circuit breaker. 2. Verify that switch S2 (the Gate Open Direction switch) is set to the correct position. 3. Turn on the unit power switch. 2. Manual Inputs 1. Verify that Manual Open fully opens the gate and that the open limit switch stops the gate. 2. Verify that Manual Close fully closes the gate and that the close limit switch stops the gate. 3. Verify that Manual Stop stops the gate.