User Guide

17 LM
T-Rail Wire
Rubber
Channel
Flush to 1/2” from edge
T-rail
Rubber
Channel
SIDE VIEW
1. Measure and cut sufficient rubber channel
to fit over the entire length of the rail
(flush to 1/2” on each end)
Open Slide
T-rail
Rubber
Channel
Chain Link
Retainer
Flange
CROSS SECTION
2. When applying rubber
channel, make sure the open
side is away from the chain
link retainer flange on the
trolley as shown.
114A1704
Header
2” Stack
Staple
Bell
Wire
T-rail
Rubber
Channel
3. The molding can accommodate up to 3
strands of bell wire. Staple wires to header
wall; then allow at least 2” of slack as
shown. Thread wires through molding.
2”
slack
Hanging
Basket
Closed
Side Of
Rubber
Channel
Opener
Bell Wire
4. At the opener end allow at least 2” of slack.
Then thread the bell wire through a hanging
bracket hole to keep wires away from sprocket
and chain. Attach wires to opener terminals
according to installation instructions.

Summary of content (1 pages)