Instructions / Assembly

7
500-4"/%)"3%8"3&3&26*3&%
X SECTION 1 (CONTINUED)
t4MJEFUIFEJNQMFEFOEPGUIFBottom Pole (ALE)JOUPUIFDFNFOUVQUPUIFJODINBSL1PTJUJPOUIFQPMFOFYUUP
UIFQMBZJOHTVSGBDF'PSSFHVMBUJPODPVSUTUIFAlignment Frame (BGW)TIPVMEDSPTTUIFQMBZJOHTVSGBDFBUUIFNJEEMF
PGUIFTDPSFENFBTVSFNFOUT
1.4
tUse a Level to make sure the Bottom Pole is standing vertical. Form
the cement into a downward slope away from the pole to allow water
runoff. Failure to do so may result in premature rusting of the Pole.
tIf the pole is buried too deep or too shallow,
the rim will not to be at the correct height.
tDo not continue the assembly until the concrete
has been allowed to set for 1-4 hours.
!
!
!
30” Rebar
Playing
Surface
ALE
TOP VIEW
BGW
ALE
Rebar
t*OTFSUUIFwSFCBSOPUJODMVEFEJOTJEFUIFBottom Pole (ALE)TPJUJTBCPVUwGSPNUIFUPQPGUIFQPMFCheck
the pole several times within the fi rst hour to make sure that all sides are vertical and that the 16-inch mark remains level with the
surface.
1.5