Installation Guide

INSTALLATION
REQUIRED TOOLS AND SUPPLIES
5.Molding,trim,transition,andnishpiecesmustnotprevent
6.Failuretofollowinstallationinstructionswillvoidwarranty.
7. Acclimationisnormallynotnecessarybutmayberequiredin
extremecircumstances.
If existing baseboard molding is dicult to remove, Quarter Round
molding will be required to cover the expansion space
need between ooring and baseboard.
*Lifeproof may be installed in a vacation home, three-seasons
room, etc., with a temperature between 55-95
0
F (12-53
0
C )
at least 48-hours before and during the installation, even if
temporary temperature measures must be taken. Thereafter,
the temperature cannot fall to below 40
0
(5
0
F) or higher than
95
0
(53
0
C), and RH must maintain between 35–70%. In these
installations, you must use transition moldings at doorways and in
any span greater than 40
0
in any direction. The same is true in light
commercial installations.
ThisproductisaoatingoorandshouldNOTbe*securedtothe
oor.Donotinstallxedobjects,suchascabinets,ontopofthe
ooringorfastentrim/molding/transitionpiecesdirectlytotheoor.
*You may adhere Lifeproof in light commercial and commercial
installations using Lifeproof MS007 adhesive, following directions
on the pail.
PleaseReadAllInstructions,Carefully,BeforeYouBeginInstallation.ImproperInstallationWillVoidWarranty
1. Readencloseddetailedinstallationinstructionsbefore
beginninginstall.
2. Aatsuboorisamust!
3.Propermoisturetestingisamust!
4.Properexpansionaroundallpermanentstructuresisamust!
• CircularSaw
• SafetyGlasses
• 1/4"or1/2"spacers
• UtilityKnife
• StraightEdgeRulerorT-Square
• Pencil
• TapeMeasureUnderlayment
Alwayscheckooringplanksfordefectssuchaschipsandcolor
variationsundergoodlightconditions.Checkthatgroovesarefreeof
debris.Use planks from multiple boxesduringinstallationtoinsure
randompatternvariation.
Theooringshouldbestoredandinstalledinaclimatecontrolled
areawithanaveragetemperaturebetween55-95
0
F(12-53
0
C)If
ooringisexposedtotemperatureslessthan40
0
F (5
0
C)ormore
than95
0
F (35
0
C)formorethanonehour,theooringmustbe
acclimatedforaminimumof12hoursbyspreadingoutthecartons
duringacclimationbutnotstackingthecartons.Ifstackingis
necessary,stackthecartonsinacrisscrossmanner-never stacking
thecartonsmorethanthreehigh.
Theareainwhichtheooringisinstalledmustremain*climate
controlledwiththetemperaturebetween65
0
85
0
Fforthelifeof
theproduct.
HYBRID RESILIENT
FLOORING

Summary of content (4 pages)