Manual

R 9150 20
Seite ist rechts 15 mm schmäler (Klappseite)
Backhoe Attachment
with Gooseneck Boom 9,30 m/30’6”
m
ft
0
-5
-6
-7
-8
-9
-10
-11
-12
-4
-3
-2
-1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
mft
45
50
40
35
30
25
20
15
10
5
0
-5
-10
-15
-20
-25
-30
-35
-40
1
1
2
3
23456789101112131415161718
051015202530354045505560
Digging Envelope 1 2 3
Stick length m 3,40 4,60 5,70
ft in 11’1” 15’1” 18’8”
Max. digging depth m 9,45 10,65 11,80
ft in 30’11” 34’11” 38’8”
Max. reach at ground level m 15,20 16,30 17,35
ft in 49’10” 53’5” 56’10”
Max. dump height m 9,85 10,20 10,50
ft in 32’3” 33’5” 34’5”
Max. teeth height m 14,15 14,90 15,20
ft in 46’4” 48’10” 49’10”
Max. digging force (ISO 6015) kN 530 440 390
lbf 119,149 98,916 87,675
Max. breakout force (ISO 6015) kN 620 620 620
lbf 139,382 139,382 139,382
Operating Weight and Ground Pressure
The operating weight includes the basic machine with gooseneck
boom 9,30 m/30’6”, stick 4,60 m/15’1” and bucket 5,00 m
3
/6.5 yd
3
.
Undercarriage HD
Pad width mm/ft in 600/1’11” 750/2’5”
Weight kg/lb 128.000/282,200 131.400/289,687
Ground pressure * kg/cm
2
/ psi 1,87/26.60 1,54/21.90
* according to ISO 16754
Buckets
For materials classe
according to VOB, Section C, DIN 18300 < 5 < 5 5 – 6 5 – 6 5 – 6 7 – 8
Typical operation
according to VOB, Section C, DIN 18300 GP GP HD HD HD XHD
Capacity ISO 7451 m
3
5,50 6,50 4,20 5,00 6,00 4,20
yd
3
7.2 8.5 5.5 6.5 7.8 5.5
Suitable for material up to a specific weight of
with stick 3,40 m t/m
3
1,6 2,2 1,8 2,2
with stick 10’5” lb/yd
3
2,698 3,710 3,035 3,710
with stick 4,60 m t/m
3
1,6 1,3 2,1 1,8 1,3 2,0
with stick 14’9” lb/yd
3
2,698 2,192 3,541 3,035 2,192 3,373
with stick 5,70 m t/m
3
1,4 1,8 1,5 1,6
with stick 18’8” lb/yd
3
2,361 3,035 2,530 2,698
Weight kg 6.500 7.000 6.600 6.800 7.200 7.300
lb 14,33 15,432 14,550 14,991 15,873 16,094
GP: General purpose bucket with Liebherr Z100 teeth
HD: Heavy-duty bucket with Liebherr Z110 teeth
XHD: Heavy-duty rock bucket with Liebherr Z110 teeth
NTB_R9150_T_enGB-US_Druck.indd 20 11.06.14 11:05