Installation guide
Installation Manual 9
ENGLISH
Installation
Hanging bolt
(W3/8 or M10)
Nut
(W3/8 or M10)
Spring washer
(M10)
Set screw of
paper model (4 pieces)
Paper model
for installation
Ceiling board
105 mm (4-1/8 inch)
15 mm (19/32 inch)
Ceiling board
Ceiling 
Flat washer for M10
(accessory)
Keep the length of the bolt
from the bracket to 40 mm (1-1/2 inch)
Open the ceiling board
along the outer edge of the 
paper model
Flat washer for M10
(accessory)
Nut
(W3/8 or M10)
Air Conditioner body
Keep the length of 105 mm(4-1/8 inch), 
15 mm(19/32 inch) between the air conditioner 
bottom surface and the ceiling surface
• The following parts are local purchasing.
① Hanging Bolt - W 3/8 or M10
② Nut - W 3/8 or M10
③ Spring Washer - M10
④ Plate Washer - M10
• TM/TN/TP Chassis
COMMUNICATION LINE(IDU-ODU)
Terminal Block
Indoor
L(L1) N(L2)
Terminal Block Indoor
RDYL A BBK
POWER
INPUT
Terminal Block
Indoor
L(L3) N(L4)
TO AIR
FRESH KIT
WIRED REMOTE
CONTROLLER
Terminal Block Indoor
1(L1) 2(L2) 3(A) 4(B)
INDOOR
POWER INPUT
• TQ/TR Chassis
A ----BABAB
GND 12V
DRY2DRY1
INTERNET
Terminal block of outdoor unit
IDUSODU
A----BABAB
GND 12V
DRY2DRY1
INTERNET
Terminal block of outdoor unit
IDUSODU
Power supply cord
Transmission cord
Remote controller cord
Power supply cord
Transmission cord
Remote
controller cord
1(L1) 2(L2)
3(A) 4(B)
• Open the control box cover and connect the remote control cord and Indoor power wires.
Wiring Connection
WARNING : Make sure that the screws of the terminal are free from looseness.
CAUTION : Tighten the nut and bolt to
prevent unit from falling off.










