Install Manual
18
Module Support BRKT
13. Disassemble Module Support BRKTs
with six (6) bolts each.
* Loosen the M6 Flange Bolts (x12)
14. Repack in the box.
6.1.2 Contact Information
'DPDJHGEDWWHULHVDUHGDQJHURXVDQGPXVWEHKDQGOHGZLWKH[WUHPHFDXWLRQ7KH\DUHQRW¿W
for use and may pose a danger to people or property. If the battery pack seems to be damaged,
contact LG Energy Solution regional contact point or your distributor. Use the contacts below
for technical assistance. These phone numbers are available only during business hours on
weekdays.
6HUYLFH&RQWDFWV
+4.252WKHU
Regions
Address
29, Gwahaksaneop-3-ro, Oksan-myeon, Heungdeok-gu,
Cheongju-si , Chungcheongbuk-do, South Korea
Email essservice@lgensol.com
US
Address 19481 San Jose Ave City of Industry, CA 91748, U.S.A
Telephone +1 888 375 8044
Email help@etssi.com
Europe
Address
E-Service Haberkorn GmbH, Stolberger Str. 25, 06493
Harzgerode, Germany
Telephone +49 (0) 6196 5719 660
Email lgchem@e-service48.de
Australia
Address Unit 12, 35 Dunlop Road, Mulgrave VIC 3170, Australia
Telephone +61 1300 178 064
Email essserviceau@lgensol.com
7. Appendix
7.1 Connection in RESU16H Prime parallel battery system
CAUTION
Parallel battery system can only be applied between products of the same energy.
6HWWLQJIRUFRPPXQLFDWLRQWHUPLQDWLRQUHVLVWRU$ERXW6HFWLRQ
%
Section A
Section B Section D Section E
Section C
When you install the pack as primary, Turn ON the DIP switch for communication termination
resistor.
When you install the pack as secondary, Turn OFF the DIP switch for communication
termination resistor.
Primary
Pack
Inverter
Terminating
resister ON
(already have)
(already have)
Inverter
Primary
Pack
Terminating
resister ON
1. Case 1 : When installing one battery
pack, Turn ON the DIP switch for
communication termination resistor.
(It is ON when switches are lowered.)
Primary
Pack
Position
: Middle side
Inverter
Terminating
resister OFF
(already have)
Primary
Pack
Terminating
resister ON
Position
: Last side
(already have)
Inverter
Primary Pack Primary Pack
Terminating
resister ON
Terminating
resister ON
2. Case 2-1 : When installing two
battery packs, and inverter has two
communication ports separately for
each battery pack, Turn ON the all
DIP switches for communication
termination resistor of both packs.
Primary
Pack
Position
: Middle side
Inverter
Terminating
resister OFF
(already have)
Primary
Pack
Terminating
resister ON
Position
: Last side
(already have)
Inverter
Secondary
Pack
Position:
Middle side
Primary Pack
Position:
Last side
Terminating
resister OFF
Terminating
resister ON
3. Case 2-2 : When you install the
two battery packs and inverter
has only one communication port
for both battery packs, Install the
secondary pack with the termination
UHVLVWRUWXUQHGR൵LQWKHPLGGOH
side. Install the primary pack with
the termination resistor turned on
in the last side. Middle side means
that it is connected two number of
communication pairs, (1
st
: from
inverter to Secondary pack, 2
nd
: from
Secondary pack to Primary pack),
Last side means that it is connected one communication pair (from Secondary pack to Primary
pack)
In Case 2-2, Communication cable is connected by daisy chain. Communication line from
inverter should be connected secondary battery pack. And the additional communication line
is connected from secondary battery pack to Primary battery pack. Secondary communication
FRQQHFWRULV¿[HGFRPPXQLFDWLRQOLQHVWOLQHLVFRQQHFWHGIURPLQYHUWHUWR6HFRQGDU\
battery pack. 2nd line is connected between Primary and secondary. If installed incorrectly, the
battery pack will not operate normally.