User manual

Installation/User’s manual
ENGLISH
3-58
3. AC Manager Operation
Applying the operation period of the schedule group with the pattern applied
1.
Creates the special schedule group and sets the air conditioner operation schedule to apply this
group and applies the operation period. In the schedule main screen, click the special schedule
setting button and then below window appears.
Click the group name from the saved schedule list. Click the date you want to set the schedule. Click
the date and click << button. Click << button and the schedule list name is reflected to the schedule
period set as above screen. After setting, click Save button. If you want to delete the schedule, select
the schedule name and click >> button.
2.
Click Save button and below Confirmation pop-up appears.