User manual
Installation/User’s manual
ENGLISH
3-50
3. AC Manager Operation
Applying the operation period of the schedule
group to which the pattern was applied
1.
Creates the schedule group and sets the air conditioner operation schedule to apply to this group
and applies the period to operate. In schedule main screen, click weekly schedule setting button,
and below window appears.
Click the desired group name from the saved schedule list. If you apply this for a year, click Apply for a
year button. If you want specific period, click the desired week on the left calendar. If you click the
week, the week turns blue. At this time, click << button.










