User guide
- 9 -
Drill and prepare the ceiling so that it can
accommodate the product (refer to page 8 for
product size).
1
Connect the 3 product cables to the interior
wiring of the building. For nishing cap, use
standardized products.
Connect the 3 product cables to the interior
wiring of the building. For nishing cap, use
standardized products.
※
The 4 Inch product is used for Single-phase
two-wire system. (Without P.E.)
2
3
Installation
Product Conguration and Information, Size
Make sure to turn o the main power switch o the installation space
before connection. Connect so that the colors of the 3 power cables
match. (LIVE: BROWN, NEUTRAL: BLUE, P.E.: GREEN/YELLOW)
[Completed installation]
Product’s power cables
Interior wiring of the building
NEUTRAL
LIVE
P.E.
WARNING










