Installation Guide

How to Install Stock Metal Blinds
1
How to Install Stock Metal Blinds
Before you begin your installation:
READ ALL INSTALLATION INSTRUCTIONS!
IMPORTANT: If bound, do not remove binding until the blinds are installed in the window.
Make sure that you have all tools and hardware needed for installation.
Check the installation surface (wall, ceiling, or window frame) to ensure that you have suitable fasteners and tools for the material.
Double check the headrail and blinds for proper width and length. If you are installing several sets of blinds, be sure to match them
with the appropriate window.
Check the parts list shipped with the product to confirm that you have the correct number of brackets.
PARTS LIST
TOOLS YOU MAY NEED (NOT INCLUDED):
Tape Measure
Pencil
Flat-blade or Philips Head Screwdriver
Drill with 1/16" Bit
2. UNPACKING THE PARTS
Remove these parts packed in the headrail. Quantity varies with blind size.
Width Up to 37 in. 37 in. to 72 in.
A. Mounting Bracket 2 3
B. Bottomrail Endcap 2 2
C. Headrail Endcap 2 2
D. Hold-down Bracket 2 2
E. #5 Screw x 3/4 in. 4 4
F. #6 Screw x 1-1/4 in. 5 7

Summary of content (2 pages)