FAQ
56
continued from page 55
or locker rooms with showering facilities, as they 
represent similar hazards. 
This revision recognizes the diculty of accessing 
occupied bathrooms.
Supplemental overcurrent devices are allowed. 
Examples of supplemental overcurrent devices are 
identified in illustration below.
Leviton Solution 
See for yourself why The 
Award-Winning Leviton 
Load Center has been called 
a breakthrough in Load Centers.
First — Faster Installation — 
Wire the entire panel at 
rough-in, without a single circuit
breaker present. The Leviton 
Load Center’s all plug-on design
 increases job site eciency 
and provides ample room
for hands to move 
and work freely.
It’s also the industry’s 
first intelligent residential
circuit breaker system with 
optional Smart Circuit Breakers. 
Then the My Leviton app consolidates control of the 
Leviton Load Center’s smart circuit breakers and the 
Decora Smart
®
 Wi-Fi
®
 product lines, enabling users to 
seamlessly control load center activities and home 
lighting from anywhere in the world using 
their smartphone or tablet.










