Installation Manual

evr-green
Level 1 / Level 2 Combination
Network Charging Station For Public Applications
lll#aZk^idc#Xdb$Zkg\gZZc&"-,,"((-",),(Zkg\gZZc5aZk^idc#Xdb
Step 6 - Install body
Ha^YZi]ZWdYndkZgi]Zbdjci^c\
pole and base plate.
Ensure the body is level.
HZXjgZi]ZWdYnidi]Zbdjci^c\
pole by tightening the four set
screws using the supplied
allen wrench.
IMPORTANT: Ensure the body is
firmly aligned to the bottom
surface and that no movement
(rocking) can take place, even
when significant pressure
is applied.
2-7
L]ZcaZkZa!i^\]iZc
Vaa)hZihXgZlh