Installation Manual

evr-green
Level 1 / Level 2 Combination
Network Charging Station For Public Applications
lll#aZk^idc#Xdb$Zkg\gZZc&"-,,"((-",),(Zkg\gZZc5aZk^idc#Xdb
Step 5 - Mount base plate/pole assembly
Pull all five wires up through the
conduit and the mounting pole.
Place the base plate/mounting pole
assembly over the wiring conduit and
ViiVX]i]ZWVhZeaViZidi]Z?"7daih
jh^c\i]Z^chiVaaZg"hjeea^ZYcjihVcY
washers as shown.
6Y_jhii]ZcjihVhcZXZhhVgnidZchjgZ
i]Zbdjci^c\edaZ^haZkZa#L]ZcaZkZa!
tighten the nuts.
IMPORTANT: Ensure the base
plate/pole assembly is level by
VY_jhi^c\i]ZcjihjcYZgcZVi]i]Z
base plate.
2-6
Position a
level on the
mounting
pole
6Y_jhii]ZhZ
nuts as
necessary to
ensure
the mounting
pole is level