LittleGiant Trailer™ 2120 Naegele Road Colorado Springs, CO 80904 Visit our website at www.LetsGoAero.com LGT 1107 - T (Torsion based model) User Assembly and Operation Manual For Assistance, please call 1-877-464-2376 or 719-630-3800 Save This Manual Read the owner’s manual over carefully before you begin using your trailer. You will need this manual for the safety warnings and precautions, operating procedures, parts list, inspection, and maintenance information.
LittleGiant Trailer™ Safe Use & Operation Be sure to follow these guidelines to prevent possible hazards from misuse. Do NOT exceed the trailer’s maximum load weight capacity of 1,500 lbs. or exceed the trailer’s bed size. The Gross Vehicle Weight Rating (G.V.W.R.) for the LittleGiant™ Trailer is 1,920 lbs, and is calculated as follows: The Empty Weight of the Trailer (420 lbs) + the maximum payload the trailer can carry (1,500 lbs) = 1,920 lbs G.V.W.R. 2.
LittleGiant Trailer™ Steps for Determining Correct Load Limit (1) Locate the statement “The weight of cargo should never exceed XXX kg or XXX lbs” on your vehicle’s placard. (2) This figure equals the available amount of cargo and luggage load capacity. (3) Determine the combined weight of luggage and cargo being loaded on the vehicle. That weight may not safely exceed the available cargo and luggage load capacity.
LittleGiant Trailer™ Wiring • The LittleGiant Trailer has a four flat-connector wire style plug. This is a common pin hole configuration for the wir- ing of towables. Check to verify your vehicle’s wiring plug style. Should it differ, consult your local hitch installer for a wire plug adaptor. • Always check all lights before towing for brake, running, signal, and side marker light operation. Make sure that all your connections are solid and that all wiring is in good condition.
LittleGiant Trailer™ Bearing Lubrication Below is a listing of approved lubrication. Lubrication Specifications Grease Dropping Point Viscosity Index 230°C (446°F) Minimum 80 Minimum The grease used should meet the requirements as shown in the chart above.
LittleGiant Trailer™ Rubber Torsion Axle Suspension Except for periodic inspection of the fasteners used to attach the rubber torsion axle to the trailer frame and a visual inspection of the welds, no other suspension maintenance is required. However, all maintenance regarding hubs, drums, rotors, bearing, wheels, and tires, should be adhered to. The torsion suspension system is a self-contained suspension system that is housed entirely inside the axle beam.
LittleGiant Trailer™ The proper procedure for the attachment of your wheels is listed at right. 4 1. Start all bolts or nuts by hand to prevent cross threading. 1 5 2. The tightening of the fasteners should be done in stages. Following the 2 3 recommended sequence above, tighten fasteners per the wheel torque chart below. 5 Bolt Pattern 3. Wheel fasteners should be torqued before the first initial road usage and after each wheel removal.
LittleGiant Trailer™ Maintenance Schedule Below is a maintenance schedule for routine maintenance of your trailer.
LittleGiant Trailer™ Parts Identification Parts List Overview Item Description A B Floor and Sidewall Trailer Body Panels 5 x 4.5 Lug Pattern Torsion Axle with Autolube Fitting C Fenders D 2" A-Frame Coupler E Safety Cables F 84" x 1.
LittleGiant Trailer™ For ease of assembly, small hardware parts are kitted and marked by assembly step.
LittleGiant Trailer™ LittleGiant Trailer™ Assembly Important Notice on Assembly Tightening of Trailer’s Under Carriage: The LittleGiant Trailer (LGT) is a precision built product and some consideration of “alignment” is necessary when first assembling the trailer’s under carriage. The LGT uses “symmetry” in a balanced manner, so when bolting the under carriage together for the first time, tighten all hardware in a two step process.
LittleGiant Trailer™ 3. Install Endgate Support Brackets 5/16” X 2” Bolt & 5/16” Lock Washer (X) Locate the Frame Angle (J), the Spring Nut, L-Bracket, Hardware Kit (X&Y), and the two (2) End Gate Support L-Brackets (T). Start from the front (hitch side) of the trailer and position a 5/16” Spring Nut (X) and an 1/2” Spring Nut (Y) as shown. Place the Spring Nut Holder at the top and bottom of the of the Spring Nut assembly as shown.
LittleGiant Trailer™ 5. Install A-frame Coupler and Safety Cables Locate the A-Frame Coupler (D), the two (2) Safety Cables (E), two 1/2” X 3” Bolts (AA), two (2) 1/2” X 3-1/2” Bolts, four (4) 1/2” Nylon Lock Nuts (CC) and six (6) 1/2” Flat Washers (BB), and two (2) 1/2” Bigger Flat Washers for Safety Cable area as noted below. Attach the A-Frame Coupler (D) to one of the A-Frame tubes and install the Safety Cable in the front hole of the coupler.
LittleGiant Trailer™ 7. Install U-Tubes Locate the U-Tubes, two (2) 5/16” X 2” Bolt assemblies (DD), twelve (12) 5/16” X 4” Bolt assemblies (EE) and sixteen (16) Pin Nut assemblies in the parts kit (X). The U-Tubes numbered 1 and 8 MUST be installed in these positions counting from the front (hitch side) to back. The remaining U-Tubes are not numbered and may be placed in any position. Remove the bolts in the front holes (nearest the hitch) in the Frame Tubes.
LittleGiant Trailer™ Locate the 24" x 84" Floor Panels, two (2) remaining 1-1/2" Wide End Gate Support L-Brackets (T). Remove the 5/16” x4” Bolts that secure the eight U-Tubes to the Frame Tubes on one side. Place one of the 24" x 84" Floor Panels on top of the U-Tubes. Place a 1-1/2" Wide End Gate Support L-Bracket into the rear ends of the Frame Tubes. Reinstall the bolts, starting with U-Tube #1 to secure the Floor, Support L-Bracket and U-Tube to the Frame Tube.
LittleGiant Trailer™ 10. Install Body Fastners Locate the twelve (12) Self Drilling Screws (Z) and twelve (12) 1” Flat Washer. Use the pre-drilled holes in the center of the floor panels and at front and rear center of panel locations as a guide to engage and tighten the self drilling fasteners though the floor panels and into the U-Tubes with an electric drill and a Phillips head. 11. Secure Side Panels 12.
LittleGiant Trailer™ 13. Install Endgate Side Latch & Position Endgate Locate the two (2) Foam Roll, 2" End Gate Latch Angles (W), eight (8) 5/16” x 1-3/4” Bolts (LL), eight (8) 5/16” Nylon Lock Nuts, eight (8) 1/4” Flat Washers (HH) and the four (4) Snap Pins (T). Install Foam on the inside edge of the End Gate. Wipe End Gates with rubbing alcohol prior to install for better results. Loosely install the End Gate Latches as shown. Use the Snap Pins to check the alignment of the latches.
LittleGiant Trailer™ 16. Light Assembly Locate the Light Assemblies and remove the hardware furnished on the assemblies. Use this hardware to install the rear signal and brake lights. Place the Light Bracket and the taillight with license plate illuminating window on the #8 U-Tube on the driver side. Orient it with the illuminated fixture down. Use the holes in the U-Tube as a guide to drill holes through the side panel.
LittleGiant Trailer™ 18. Install Fenders Locate the Fenders, six (6) Self Drilling Screws, six (6) 1/4” X 1” Flat Washer and six (6) Lock Washers. Measure 13” from the top of the C-Channel on the #5 U-Tube and mark the location. Use the self drilling screw to pre drill the hole. Align the top hole of the fender with the predrilled hole. Make sure the fender is level, now mark corresponding holes on the side of fender on the #4 and #6 13” Fender Self Drilling Screws and 1” Flat Washer 19.
LittleGiant Trailer™ Tuning Tips If you will be using your LittleGiant Traler™ for light loads (under 750 lbs), the 30 psi recommended tire pressure can be reduced to 22 psi to further enhance the trailer’s soft ride. Trailer Licensing Notice Some states may consider this trailer a vehicle requiring registration, licensing, and titling.