Installation Guide
Figure 23
19. Install the Bottom Two Rollers
Make sure that the Glass Door with Rollers hangs to 
the Upper Guide Rail (4), and the glass bottom is 
inside the Guide Block (12), now adjust glass to 
vertical and then install the bottom two Rollers (5).
Please see Fig 23 for details
www.lesscare.com
ULTRA-D
 SHOWER ENCLOSURES
INSTALLATION STEPS
15
15
27










